Flexed Budget Variances in a Volatile Month

AAT Level 4 AMAC · Put your knowledge to work in context.

All case studies

Flexed Budget Variances in a Volatile Month

Harbour Mouldings produces a single component. The static budget for October was: output 5,000 units, direct material 2 kg per unit at £8/kg, direct labour 0.5 hours per unit at £14/hour, variable overhead £3 per labour hour, fixed overhead £40,000. Actual results: output 5,600 units; material purchased and used 11,760 kg costing £91,728; labour 2,912 hours costing £39,312; variable overhead £9,600; fixed overhead £41,300. The production manager is praised for beating the static material budget, while the purchasing manager claims the material price rise was unavoidable because a supplier failed and emergency buying was needed at short notice.

1. Calculate the flexed budget and the material, labour and variable overhead variances, stating whether each is favourable or adverse.

Read the worked answer

Flexed budget at 5,600 units:

  • Material: 5,600 × 2 kg = 11,200 kg × £8 = £89,600
  • Labour: 5,600 × 0.5 h = 2,800 h × £14 = £39,200
  • Variable OH: 2,800 h × £3 = £8,400
  • Fixed OH: £40,000

Material variances:

  • Price: (standard price − actual price) × actual qty = (£8 − £91,728/11,760) × 11,760. Actual price = £7.80/kg. (£8.00 − £7.80) × 11,760 = £2,352 favourable.
  • Usage: (standard qty − actual qty) × standard price = (11,200 − 11,760) × £8 = £4,480 adverse.
  • Total material variance: £89,600 − £91,728 = £2,128 adverse.

Labour variances:

  • Rate: (£14 − £39,312/2,912) × 2,912. Actual rate = £13.50/h. (£14.00 − £13.50) × 2,912 = £1,456 favourable.
  • Efficiency: (2,800 − 2,912) × £14 = £1,568 adverse.
  • Total: £39,200 − £39,312 = £112 adverse.

Variable overhead:

  • Expenditure: (2,912 × £3) − £9,600 = £8,736 − £9,600 = £864 adverse.
  • Efficiency: (2,800 − 2,912) × £3 = £336 adverse.
  • Total: £8,400 − £9,600 = £1,200 adverse.

2. Assess the managers' claims and recommend what the variance report should say.

Read the worked answer

Production manager's 'beat the static budget' claim is misleading. The static material budget was £80,000 (5,000 × 2 × £8), and actual spend was £91,728 - apparently £11,728 over. But the correct comparison is the flexed budget: £89,600 vs £91,728 gives only a £2,128 adverse variance. Comparing actual to static ignores the 600-unit volume increase, so praise or blame based on the static figure is invalid. On the flexed basis the manager has an adverse usage variance of £4,480 (5% over standard), which needs explanation.

Purchasing manager's claim is only partly supported. The price variance is favourable (£2,352), not adverse - the emergency supplier was actually cheaper per kg than standard. So the 'unavoidable price rise' argument does not hold. However, the usage variance may be linked: emergency material could be of inconsistent quality, causing waste. That is a plausible operational explanation but must be evidenced, not assumed.

Recommendation: report both price and usage variances on the flexed basis; separate the controllable usage variance from the volume effect; investigate whether emergency sourcing drove the 5% excess usage; and note that the labour rate is favourable but efficiency is adverse, consistent with less experienced cover or rushed working.