ACCA AFM study materials
ACCA AFM study resources

Aardvark Air's Fleet Replacement Decision

ACCA AFM · Put your knowledge to work in context.

All case studies

Aardvark Air's Fleet Replacement Decision

Aardvark Air operates 12 regional aircraft with an average age of 14 years. It can (a) continue operating the fleet for 5 more years with annual maintenance rising from £8m to £14m and a residual value of £10m, or (b) replace now with 10 new aircraft costing £320m, depreciated straight-line to zero over 10 years, cutting fuel and maintenance costs by £22m pa and yielding a residual of £60m at year 10. The new fleet requires a £40m upfront training and certification cost. Aardvark's equity beta is 1.35, debt/equity is 40:60, the risk-free rate is 3.5%, the market return is 9%, pre-tax cost of debt is 5.5%, and tax is 25%. The project is in the same risk class as existing operations.

1. Compute the appropriate discount rate and evaluate the replacement using NPV over a consistent horizon.

Read the worked answer

WACC. Unlever the equity beta: βu = 1.35 / [1 + (1−0.25)(40/60)] = 1.35 / 1.5 = 0.90. Re-lever at target D/E 40:60: βl = 0.90 × 1.5 = 1.35 (unchanged, so use 1.35).

Ke = 3.5% + 1.35 × (9% − 3.5%) = 3.5% + 7.425% = 10.93%. Kd after tax = 5.5% × 0.75 = 4.13%. Weights E 60%, D 40%.

WACC = 0.6 × 10.93% + 0.4 × 4.13% = 6.56% + 1.65% = 8.21%.

Horizon mismatch. Option (a) covers 5 years, option (b) 10 years. Use an equivalent annual annuity (EAA) comparison or extend (a) to a 10-year equivalent. Simplest: compare on a 10-year basis assuming (a) is repeated (maintenance costs continue rising).

Option (b) NPV. Outflows: £320m + £40m training = £360m at t0. Annual saving £22m for years 1–10. Tax: depreciation £32m pa gives tax shield £8m pa; savings taxed at 25% so net cash saving = 22 × 0.75 + 8 = £24.5m pa. Residual £60m at year 10 (assume no tax on residual for simplicity).

PV of £24.5m annuity, 10 yrs @ 8.21%: annuity factor = (1 − 1.0821⁻¹⁰)/0.0821 = (1 − 0.4546)/0.0821 = 6.643. PV = 24.5 × 6.643 = £162.8m. PV residual = 60 × 0.4546 = £27.3m. Total PV inflows = £190.1m. NPV = 190.1 − 360 = −£169.9m.

Option (a) NPV. Rising maintenance £8m→£14m (increment £1.2m pa), no capital outlay, residual £10m at year 5. Discounted over 5 years, the PV of maintenance costs is substantial but far smaller in absolute terms than £360m capex, and no £320m outflow.

Judgement. On these inputs, replacement is value-destructive unless the £22m saving is understated or the aircraft cost is financed off-balance-sheet. The model answer should flag that the £22m saving is too small relative to £320m capex; the case turns on whether savings persist for 10 years and whether residual/financing terms change the picture.

2. The board argues the discount rate should be the group WACC of 6.5% because 'aircraft are core.' Critique this and state the correct treatment.

Read the worked answer

Critique. Using a group WACC of 6.5% for a specific fleet-replacement decision is wrong on two counts:

  1. Risk-class mismatch. The group WACC reflects the average risk of all Aardvark's activities. If the new fleet has a different operating risk profile (new routes, different aircraft type, different demand elasticity), its cash flows should be discounted at a rate reflecting that project's systematic risk, not the group average. Using a lower rate than justified systematically overstates NPV and biases the decision toward acceptance.

  2. Financing side-effects. The 6.5% figure may embed the group's existing capital structure. If the fleet is debt-financed with a different gearing, the WACC should be re-levered to the project's target gearing (as done here: 8.21%).

Correct treatment. Estimate a project-specific asset beta from comparable pure-play regional airlines, re-lever to the project's target D/E, and compute a project WACC. If no reliable comparable exists, use the group WACC only if the project is genuinely in the same risk class - which the question states it is - but then the correct group WACC is 8.21%, not 6.5%. The 6.5% figure appears to understate the cost of equity; at 6.5% the £24.5m annuity factor becomes 7.19, PV inflows £203m, NPV −£157m - still negative, so the decision is robust to the rate choice, but the reasoning must be corrected.