Afghanistan Specialization Entry Exam study materials
Afghanistan Specialization Entry Exam study resources

Water Rights on a Drying River

Afghanistan Specialization Entry Exam · Put your knowledge to work in context.

All case studies

Water Rights on a Drying River

A river feeding an irrigated plain of roughly 90,000 hectares splits at a traditional diversion point between an upstream district dominated by one ethnic community and a downstream district dominated by another. A drought year has cut flow by an estimated 40%. Upstream commanders have rebuilt an old diversion structure without consulting the downstream shura, and downstream farmers report canals running dry two weeks earlier than normal. A provincial water committee exists on paper but has not met in eight months. An NGO proposes a 'water-sharing agreement' facilitated by traditional elders. The provincial governor wants to avoid any meeting that could be framed as ethnic grievance. No current hydrological measurement exists below the diversion point.

1. What is the most defensible first step, and why is a written water-sharing agreement premature?

Read the worked answer

The first step is measurement and a neutral factual baseline, not a signed agreement. Without flow data below the diversion, any 'sharing' formula is guesswork that will be litigated by whoever feels cheated. Install or restore gauges, document the rebuilt structure's capacity, and record actual downstream shortfall.

A written agreement is premature because:

  • No shared facts: the parties dispute the size of the shortfall, so they cannot agree on shares.
  • No legitimate forum yet: the statutory committee is dormant; an elder-facilitated deal may lack enforcement and could be repudiated by commanders.
  • Ethnic framing risk: a bilateral 'upstream community vs downstream community' deal hardens identity lines the governor fears, whereas a technical water committee keeps it about cubic meters.

The defensible sequence: data → reactivate the statutory committee with technical staff → interim operating rules → only then a formal agreement.

2. The governor wants to suppress the ethnic dimension entirely. Assess the risks of that strategy.

Read the worked answer

Suppressing the ethnic dimension is partly right and partly dangerous. Right, because framing water as an ethnic contest invites mobilization and makes compromise a betrayal of the group. Dangerous, because the underlying distributional grievance is real: upstream actors rebuilt a structure that shifts water to their own community, and downstream farmers experience that as targeted. If the state refuses to name the asymmetry, downstream communities conclude the process is captured and may resort to violence or appeal to commanders.

The better approach is depoliticize the instrument, not the grievance: keep negotiations technical (flows, gates, schedules) while explicitly acknowledging the downstream harm and ensuring downstream representation in the committee. Denial of a real asymmetry is what escalates identity politics; addressing it through neutral rules defuses it.