Waste Handling and Disposal Dilemma

AL Asbestos Abatement · Put your knowledge to work in context.

All case studies

Waste Handling and Disposal Dilemma

A crew has removed 300 linear feet of asbestos-containing pipe insulation (15% amosite) from a school building. The waste is bagged in 6-mil polyethylene bags, but some bags are torn and leaking dust. The waste is stored in a locked dumpster outside the building. The dumpster is not labeled. The contractor plans to transport the waste to a landfill that accepts asbestos waste, but the landfill requires waste to be wetted and sealed in leak-proof containers. The contractor's truck is not covered. The school is in session, and children are nearby. The contractor is behind schedule and wants to transport the waste immediately without re-bagging. The landfill is 50 miles away. The contractor has a manifest but has not filled it out completely.

1. What are the regulatory requirements for handling and transporting this asbestos waste?

Read the worked answer

Under NESHAP 40 CFR 61.150, asbestos waste must be wetted and sealed in leak-proof containers. Torn bags must be placed in a second bag (double-bagging) or other leak-proof container. The waste must be labeled with the required warning. The dumpster must be labeled as containing asbestos. The transport vehicle must be covered (e.g., tarp) to prevent release. The manifest must be fully completed, and the landfill must be notified. The contractor must also comply with DOT regulations for hazardous materials if applicable (asbestos is a hazardous material for transport if in quantities requiring placarding). The waste cannot be transported until these requirements are met. The contractor should stop work, re-bag the waste, label containers, cover the truck, complete the manifest, and then transport.

2. What are the potential consequences of transporting the waste as planned?

Read the worked answer

Transporting torn bags in an uncovered truck could release asbestos fibers into the environment, violating NESHAP and potentially endangering public health, especially children at the school. The contractor could face fines from EPA or state agencies, and the landfill could reject the waste. The contractor could also be liable for cleanup costs and civil penalties. Additionally, the incomplete manifest could result in violations of DOT and EPA manifest requirements. The contractor should not proceed until all requirements are met. The school should be informed of the situation, and the area around the dumpster should be inspected for contamination.