AMPP CCI-2 study materials
AMPP CCI-2 study resources

AMPP CCI-2: Coating Application and Inspection Techniques

AMPP CCI-2 · Work through your exam, one topic at a time.

All guide sections

Coating Application and Inspection Techniques

What the candidate must know

Application inspection covers mixing, induction time, pot life, application method, and the wet-to-dry film relationship. Understand WFT (wet film thickness) measured with a comb or wheel gauge, DFT (dry film thickness) measured with magnetic or eddy-current gauges, and how volume solids link them: DFT = WFT × volume solids fraction (plus thinning effects). Know the DFT measurement rules - number and spacing of readings per area, and how to handle a reading outside range.

Other essentials: stripe coating of welds, edges, and difficult areas; overlap and pass technique for spray; holiday/pinhole detection (low- and high-voltage testers and when each applies); and curing/overcoating windows from the product data sheet. Recognize defects and their usual causes: sagging (too much applied), runs, orange peel (atomization/spray issues), pinholing (solvent or air entrapment), and mud cracking (too thick per coat).

Traps in questions

  • Using WFT as the acceptance criterion when the spec requires DFT.
  • Ignoring volume solids when converting WFT to DFT.
  • Applying a high-voltage holiday tester to a thin or conductive coating and causing damage.
  • Skipping stripe coats on edges, then blaming the topcoat for premature failure.

Rule of thumb / worked example

DFT = WFT × volume solids. If a coating has 60 percent volume solids and the spec requires 150 µm DFT, target WFT = 150 ÷ 0.60 = 250 µm. If the applicator sprays 200 µm WFT, expected DFT is about 120 µm - below spec, so adjust passes. Always confirm with gauge readings after cure rather than trusting the calculation alone.