Developer Application Consistency on Complex Geometries

ASNT NDT Level III PT · Put your knowledge to work in context.

All case studies

Developer Application Consistency on Complex Geometries

A Level III is evaluating a penetrant testing process for a set of cast aluminum impellers with intricate internal cooling passages. The specified developer is a nonaqueous wet developer (suspension) applied by spraying. The procedure requires a 10-15 minute developer dwell time. The Level III observes that operators are spraying the developer from a distance of about 30 cm, and the coating appears uneven-some areas are heavy and powdery, while others are very thin. The impellers are being tested in a batch of 20, and the first 5 have shown indications that were later confirmed as false calls due to developer pooling. The ambient temperature in the inspection area is 35°C, and the humidity is 80%. The developer is mixed according to the manufacturer's instructions, but the container has been open for several days. The Level III must determine the cause of the uneven coating and false calls, and recommend improvements.

1. What are the probable causes for the uneven developer coating and the false indications?

Read the worked answer

The uneven coating is likely caused by: (1) Improper spray distance and technique-30 cm is too close, leading to heavy localized application and runs; the recommended distance is typically 20-30 cm but must be uniform and in a sweeping motion. (2) High ambient temperature (35°C) causing the developer to dry too quickly, leading to powdery deposits and poor coverage. (3) High humidity (80%) affecting the suspension properties and drying. (4) The developer container being open for days may have allowed evaporation of the carrier, changing the concentration and causing agglomeration or settling. (5) Inadequate agitation before use-the developer must be thoroughly mixed to ensure a uniform suspension. False indications from pooling: excessive developer accumulation in crevices or low areas can trap penetrant and produce false bleed-out, or the developer may flake off and appear as indications. The intricate passages may also retain penetrant if not properly rinsed, leading to false calls.

2. What corrective actions and procedural changes should the Level III implement to ensure reliable inspection?

Read the worked answer

Corrective actions: (1) Reject and replace the open developer container; use fresh, properly sealed developer. (2) Train operators on proper spray technique: maintain a distance of 20-30 cm, use a sweeping motion, apply a thin, uniform coating, and ensure the part is dry before application. (3) Control the environment: if possible, reduce temperature and humidity to within acceptable limits (e.g., below 30°C and 50% RH) or use a developer specifically formulated for high humidity. (4) Implement a check of developer concentration using a viscosity cup or specific gravity as per manufacturer's instructions. (5) For intricate passages, ensure thorough rinsing and drying before developer application; consider using a different developer application method (e.g., dipping or flooding) if spraying is inadequate. (6) Re-inspect the batch of 20 impellers after correcting the process. (7) Update the procedure to include developer mixing, container handling, and environmental limits. (8) Perform a system performance check with a cracked block or test panel to verify the entire process.