Azure AZ-400 study materials
Azure AZ-400 study resources

Azure AZ-400: Design and implement processes and communications

Azure AZ-400 ยท Work through your exam, one topic at a time.

All guide sections

Design and implement processes and communications

Process templates and hierarchies

Azure DevOps ships four process templates - Basic, Agile, Scrum and CMMI - and the work item hierarchy changes with each one. Agile is Epic > Feature > User Story > Task/Bug; Scrum replaces User Story with Product Backlog Item; CMMI inserts Requirement (and Change Request); Basic is Epic > Issue > Task. Bugs can be tracked at the backlog level or alongside tasks - that behaviour is configured in process settings, not in a query.

Area paths vs iteration paths

Area paths answer where work lives - team, product, component. Iteration paths answer when - the sprint cadence. Each team subscribes to specific area and iteration paths, which is how several teams share one project yet plan independently. Delivery Plans aggregate the iterations of multiple teams onto one calendar; that is the answer whenever a question mentions cross-team, multi-sprint visibility.

Communication surfaces

Dashboards host widgets such as velocity, burndown, query tiles and embedded content, and are scoped to a team or project. Wikis are Markdown stored in a Git repository - either a provisioned project wiki or code published as a wiki. Subscriptions, service hooks and the Azure Boards/Teams integrations push events out to email, Microsoft Teams, Slack or webhooks. Azure Boards also links to GitHub for commit mentions and work item references.

Traps

  • Cross-team timeline requested โ†’ Delivery Plans, not a dashboard or query chart.
  • Alerting humans on build failure โ†’ notification subscription or service hook, not a widget.
  • Assuming every process template uses the same work item names.
  • Confusing area path permissions with iteration path permissions.

Rule of thumb

Area = where, iteration = when, Delivery Plan = who and when across teams. When a question mentions two or more teams over time, reach for Delivery Plans.