Heat Stress During a Roofing Project

BCSP GSP · Put your knowledge to work in context.

All case studies

Heat Stress During a Roofing Project

A roofing crew of nine is replacing a membrane on a large commercial roof in late July. Forecast highs are 36 C with high humidity; roof surface temperatures are measured at 60 C. Work starts at 07:00 and is scheduled to 17:00 with a 30-minute lunch. New hires make up four of the crew; they started this week. Water is available in a cooler at ground level, reached by a ladder. Workers wear long sleeves and hard hats. By early afternoon, one worker is confused, has stopped sweating, and is being helped by coworkers who want to sit him in the shade and give him water.

1. Evaluate the heat stress controls and identify what is missing for this crew and conditions.

Read the worked answer

The controls are inadequate for the conditions and the workforce.

Conditions. A 36 C air temperature with high humidity and a 60 C roof surface creates a high wet-bulb globe temperature. Radiant and conductive heat from the roof adds load beyond air temperature alone.

Workforce. Four new hires in their first week are at elevated risk because acclimatization takes days to weeks. They should be on a graduated schedule with closer supervision, not full production from day one.

Water. A cooler at ground level reached by a ladder is a barrier. Water must be within a few steps of the work area, and workers must be encouraged to drink before thirst.

Rest and schedule. A single 30-minute lunch is not a heat management plan. Scheduled rest in shade or cooling, with frequency increasing through the day, is needed. Starting early helps but the afternoon is the highest-risk period.

Clothing. Long sleeves and hard hats add heat load; cooling vests or lighter, breathable options should be considered.

Monitoring. No physiological or environmental monitoring appears to be in place, and no buddy system is described.

2. The confused worker has stopped sweating. What is the correct response, and what is the difference between this and heat exhaustion?

Read the worked answer

Recognition. Confusion and cessation of sweating in a hot environment indicate heat stroke, a medical emergency. Heat exhaustion presents with heavy sweating, weakness, dizziness, and nausea but preserved mental status.

Response. Call emergency medical services immediately. Move the worker to shade, remove excess clothing, and begin active cooling with cold water, ice packs to the neck, armpits, and groin, and fanning. Do not rely on shade alone. Do not give fluids to a confused worker who may not be able to swallow safely. Stay with the worker until help arrives.

Why speed matters. Heat stroke can progress to organ failure and death; cooling should begin before transport, not after.

Program response. After the event, stop work, reassess the heat plan, and implement scheduled rest, proximal water, acclimatization for new hires, and buddy checks. Document the incident and verify corrective actions. The presence of new hires and the absence of monitoring make this event foreseeable, which matters for both prevention and liability.