A Wind Turbine for a School

A school considers a 10 kW rated wind turbine. Local wind data show an average wind speed of 5.5 m/s at hub height. The turbine's power curve gives 1.2 kW at 5 m/s and 2.0 kW at 6 m/s. Capacity factor at this site is estimated at 22%. The school uses 45,000 kWh per year. The turbine costs $38,000 installed with a 20-year life and $1,500/year maintenance. The grid pays $0.11/kWh for exported power, and the school buys grid power at $0.16/kWh. A neighbour objects that the turbine will be noisy and will not pay back.

1. Estimate the turbine's annual energy output and the fraction of the school's demand it meets.

Read the worked answer

Annual output using capacity factor:

Energy = rated power × hours per year × capacity factor = 10 kW × 8,760 h × 0.22 = 19,272 kWh/year, about 19,300 kWh.

Fraction of school demand: 19,272 ÷ 45,000 = 0.428, about 43%.

Cross-check with the power curve: at 5.5 m/s the turbine sits between 1.2 kW and 2.0 kW, roughly 1.6 kW instantaneous. If the wind blew at 5.5 m/s constantly, that would give 1.6 × 8,760 = 14,016 kWh. The capacity-factor estimate is higher because wind speeds vary and output rises steeply with speed, so gusty periods contribute disproportionately. The two estimates bracket the likely output; a realistic range is roughly 14,000–19,000 kWh per year, or 31–43% of demand. The school should treat 43% as an optimistic case and 31% as conservative.

2. Assess the economics and address the neighbour's payback objection.

Read the worked answer

Value of output. If the school self-consumes most of the power, each kWh displaces $0.16 of grid purchase. At 19,272 kWh:

  • Savings: 19,272 × 0.16 = $3,083/year.
  • Net of maintenance: $3,083 − $1,500 = $1,583/year.
  • Simple payback: $38,000 ÷ $1,583 ≈ 24 years.

That exceeds the 20-year life, so at the optimistic output the project does not pay back. At the conservative 14,000 kWh:

  • Savings: 14,000 × 0.16 = $2,240; net $740/year; payback ≈ 51 years.

Conclusion: the neighbour's payback objection is correct on these numbers. The project only becomes viable with a capital grant, a higher capacity factor, or a lower installed cost.

Noise: the neighbour's concern is legitimate and should be checked against the manufacturer's sound-power level and the distance to the property line, not dismissed. A siting setback and a noise specification should be part of any revised proposal.