Ammonia Release at a Cold Storage Warehouse

NEB BCSE · Put your knowledge to work in context.

All case studies

Ammonia Release at a Cold Storage Warehouse

A cold storage warehouse uses an ammonia refrigeration system with a charge of 1,800 kg. At 02:10 on a Sunday, a night shift of six workers smells ammonia near the compressor room. The facility has an ammonia detection system with alarms that ring locally but are not connected to an off-site monitoring service. The written emergency plan calls for evacuation to a gravel lot 60 m upwind, but the wind is blowing from that direction toward the lot. The plan names an incident commander who is on vacation. Two workers want to investigate the leak themselves because the last contractor response took 90 minutes. The local fire department has ammonia training but has never pre-planned with the facility.

1. Evaluate the emergency plan's deficiencies as revealed by this event and identify the immediate decisions the night shift must make.

Read the worked answer

Deficiencies revealed:

  • No off-site notification. Local-only alarms mean no one outside the facility knows a release occurred at 02:10 on a Sunday. This delays response and leaves the night shift isolated.
  • Assembly point is not wind-aware. A single fixed lot 60 m upwind is unsafe when wind reverses. The plan needs multiple assembly points selected by wind direction, or a rule for choosing one.
  • Incident commander unavailable with no alternate. Naming one person without a designated alternate and a delegation rule leaves the shift without authority at the moment it is needed.
  • No pre-planning with the fire department. The responding agency has training but no site knowledge, so it will lose time finding the compressor room, shutoffs, and water supply.
  • Self-investigation is not addressed. The plan does not clearly prohibit untrained workers from approaching a leak, and the 90-minute contractor history creates pressure to do so.

Immediate decisions for the night shift:

  1. Evacuate and account for all six workers at a location selected for the actual wind direction, not the fixed lot.
  2. Call 911 and report an ammonia release with the location and approximate scale; request the fire department.
  3. Do not investigate. Untrained personnel approaching an ammonia leak risk severe respiratory injury.
  4. Shut down or isolate equipment only if trained and safe to do so remotely; otherwise leave it to responders.
  5. Notify the on-call manager and attempt to reach the vacationing commander's alternate.
  6. Establish a safe exclusion zone and keep personnel from re-entering.

2. Propose revisions to the emergency plan and the detection system, and describe how you would test the revised plan.

Read the worked answer

Detection and notification:

  • Connect alarms to an off-site monitoring service or auto-dial list so after-hours releases are detected without relying on smell.
  • Add audible and visual alarms throughout occupied areas and a clear evacuation signal distinct from other alarms.
  • Consider ammonia detection in occupied spaces, not only the compressor room, given the charge size.

Plan revisions:

  • Multiple assembly points with a rule to select based on wind direction, and a means to know wind direction at night (windsock, anemometer with display).
  • Incident command succession: named commander, at least two alternates, and a rule for who assumes authority on nights and weekends.
  • Explicit no-investigation rule for untrained staff, with a clear instruction to evacuate and call.
  • Pre-plan with the fire department: joint site visit, shared drawings showing the compressor room, shutoffs, and access routes, and a agreed response protocol.
  • Contractor response expectations documented, with a target response time and an interim measure if the contractor is delayed.
  • Communication plan for notifying all shifts and any neighboring occupants.

Testing:

  • Conduct a drill on a night shift with the fire department present, using a wind direction that makes the primary lot unsafe, to test assembly point selection.
  • Time the notification chain from alarm to off-site notification and to responder arrival.
  • Debrief with all participants and record gaps with owners and due dates.
  • Repeat at least annually and after any change to the system or staffing, and verify that corrective actions from the drill are closed.