PEBC Tech QE Part I study materials
PEBC Tech QE Part I study resources

The Fridge Went to 12.4 Degrees

PEBC Tech QE Part I · Put your knowledge to work in context.

All case studies

The Fridge Went to 12.4 Degrees

Monday, 08:00, October, community pharmacy. The data logger on the vaccine refrigerator shows the cabinet sat at 12.4 C from Saturday 19:00 to Sunday 06:30 - about 11.5 hours - and was back at 4 C by 07:00. Inside are 84 doses of injectable influenza vaccine, 20 doses of recombinant zoster vaccine and 12 doses of pneumococcal conjugate vaccine. A flu clinic is booked for 46 patients starting at 10:00. The wholesaler can deliver 100 influenza doses by 14:00 if the order is placed before 09:00. The pharmacist-in-charge is not in until 09:30 and the owner is away.

1. It is 08:05. List your actions in order and explain why each one matters.

Read the worked answer
  1. Quarantine, don't discard. Label 'DO NOT USE - temperature excursion,' move to a separate, clearly marked location, and keep it refrigerated and monitored. Discarding destroys both the product and the evidence, and the manufacturer may still release it.
  2. Preserve the data. Print/download the logger trace: minimum, maximum, duration out of range, mean kinetic temperature, time back in range. Memory can roll over; get it now.
  3. Call each manufacturer (influenza, zoster, pneumococcal) with product, lot, quantity, temperatures and times. They - not you, not the pharmacist - determine whether the product is still usable, usually within 24-48 hours.
  4. Notify the pharmacist on duty and page the PIC. If any stock is publicly funded, notify public health as well.
  5. Document everything: what happened, what you did, who you called, times, decisions.
  6. Protect the rest of the inventory: confirm the refrigerator is now holding 2-8 C, check whether insulin or other patient stock sits in the same unit, and post a sign on the door.

Do not administer or dispense a single dose from the quarantined stock until the manufacturer or policy clears it. 'It looks fine' is not a stability assessment.

2. The clinic starts at 10:00 with 46 patients booked. How do you handle it?

Read the worked answer

Do not run the clinic on unverified stock. Build the options and let the PIC approve one:

  • Order now. Place the 09:00 order for 100 doses arriving at 14:00 and move the clinic to an afternoon/evening window. Call the 46 patients - this is technician work and it should start immediately, because the call list is the long pole.
  • Borrow. Ask a neighbouring pharmacy to lend doses with an intact documented cold chain and a transfer record. Verify their logger data; do not accept a verbal 'it's been in the fridge.'
  • Partial clearance. If a manufacturer clears specific lots by late morning, use only those, and only the cleared lots.

Rebooking priority: imminent travellers, older adults, young children, pregnant patients, and anyone with a chronic condition - ask the pharmacist to confirm the ordering if it is unclear.

Never: 'use it anyway, it was only one night,' or quietly mix quarantined and fresh stock to keep the schedule. Losing a clinic morning is recoverable; a compromised vaccine is not.

3. What follow-up would show the problem was actually fixed, not just survived?

Read the worked answer

Root cause first: door left ajar, defrost cycle, power interruption, blocked vent, thermostat drift, or stock packed against the back wall. Without a cause, the same thing happens next quarter.

Then, verifiable fixes:

  • Continuous monitoring with alarms that reach someone after hours (text/phone), not a logger nobody reads.
  • Twice-daily min/max temperature log with initials - a second, human check on the device.
  • Written SOP for excursions: quarantine, who calls the manufacturer, who is notified, how patients are contacted.
  • Staff training, including the locum and the weekend crew, with a signed record.
  • Corrected inventory: what was written off, what the manufacturer released, what was replaced - with dollar values, because the owner will ask.
  • Manufacturer responses kept in writing on file, and the excursion report retained for the accreditation inspector.

Test of a real fix: if the fridge fails again on a Saturday night, does someone know before Monday 08:00?