Riverside Community Health: Reading a Quarter-One Variance Correctly

CFLM / FLM Exam · Put your knowledge to work in context.

All case studies

Riverside Community Health: Reading a Quarter-One Variance Correctly

Riverside Community Health is a non-profit clinic with an $8.4m annual operating budget. Its quarter-one finance report was prepared by an accounts-payable clerk from the cashbook, because the CFO is on leave until month five. It shows spend of $2.28m against a straight-line budget of $2.10m. Personnel is at 28.8% of its $5.04m annual line, driven by a 3% market adjustment approved in month two and two overlapping maternity covers. The $1.4m restricted diabetes grant is 35% consumed; $60k of staff time charged to it is not supported by time-and-effort records. IT and equipment sits at 19% of its line because two purchase orders were raised in March but goods have not arrived. Training is at 21% of its line. The COO proposes closing a projected $310k year-end gap by deferring $180k of clinical training and $130k of equipment refresh, both unrestricted. The diabetes programme manager says the grant is 'fine because we have spent the money we were given'. The board pack is due in four days.

1. Assess the reliability of the COO's projected $310k gap. Classify the quarter-one variances as timing, structural or compliance, and give your best estimate of the underlying run-rate problem.

Read the worked answer

First, the basis of the report. A cashbook-built report is not an accruals report. It understates liabilities for goods and services received but not invoiced, and it overstates savings where commitments exist but cash has not moved. Any gap calculated from it is directional at best, and the board pack must say so.

Timing variances (not savings):

  • IT and equipment at 19%: purchase orders raised, goods not received. The commitment exists. Accrue it and treat it as spend, not headroom.
  • Training at 21%: partly phasing, but also the COO's proposed cut, so the 'saving' is already being double-counted.

Structural variances (permanent unless addressed):

  • The 3% market adjustment on a $5.04m personnel base is roughly $151k annualised and recurs every year. This is the real, permanent part of the gap.
  • Maternity cover is temporary but real while it lasts; it should be quantified for the remaining months, not annualised.

Compliance issue:

  • $60k of unsupported staff time on a restricted grant is not a variance; it is a potential disallowed cost and a repayment risk.

Best estimate: the durable run-rate gap is closer to $150k–$190k, not $310k, once accruals are recognised and the one-off maternity element is separated. Presenting $310k conflates a permanent pay decision with temporary cover and a deferral that simply moves cost into next year.

2. How should the restricted diabetes grant spending be handled, and what must happen before the board pack is finalised?

Read the worked answer

On the grant, in this order:

  1. Reconstruct time-and-effort support for the $60k. Where it cannot be evidenced, reclassify the cost to unrestricted funds. Charging unsupported staff time to a restricted award is an allowability breach regardless of intent.
  2. Check the award terms on carry-forward, period of performance and any cap on staff costs. Spending at 35% by quarter one is only a problem if the spend is ineligible or the activity is behind schedule; 'we spent what we were given' is not a compliance position, and neither is spending faster to avoid returning funds.
  3. If ineligible costs are confirmed, disclose to the funder proactively and agree a correction. Voluntary disclosure is materially cheaper than a finding at audit.
  4. Test the supplanting rule: grant funds must not replace costs the organisation would otherwise bear, which is a live risk if unrestricted budgets are being squeezed and grant-funded posts are absorbing core work.

Before the board pack is finalised:

  • Recast on an accruals basis, with the two IT purchase orders accrued.
  • Obtain CFO or qualified delegate review - if the CFO is on leave, appoint an acting signatory in writing. An unreviewed clerk-prepared pack should not go to a board.
  • Add a note describing the basis of preparation, the known limitations, and the $60k exposure with a range.
  • Reconcile restricted fund balances to the ledger and show restricted and unrestricted columns separately.
  • Re-state the gap on a run-rate basis with the timing items clearly labelled.

3. Evaluate the COO's proposed deferrals as a corrective action. Propose a better sequence of actions, and the criteria for what may and may not be cut.

Read the worked answer

Evaluation. Deferring $180k of clinical training and $130k of equipment refresh is presented as closing a gap, but it is not a saving - it is a liability shifted into next year, and it is being booked against a gap that is itself overstated by timing items. There are also real risks: clinical training frequently underpins mandatory competencies and accreditation, and equipment deferral raises maintenance cost, downtime and possibly safety exposure. Cutting the two most deferrable-looking lines because they are the easiest to cut is a classic budget-cutting error.

Better sequence:

  1. Correct the baseline first - accrue the purchase orders, reclassify the unsupported grant time, restate the gap on a run-rate basis. Never cut against a number you do not trust.
  2. Take the non-payroll, non-clinical discretionary items: agency and locum spend, consumables, travel, contracted services, and any duplicate software licences.
  3. Look for allowable cost shifts onto the restricted grant for genuinely eligible activity, freeing unrestricted funds - subject to the supplanting test.
  4. Re-phase the 3% market adjustment only if it has not yet been implemented and only with an explicit retention-risk assessment; reversing a pay decision has its own cost.
  5. Check the vacancy factor and whether maternity cover can be met partly through internal backfill.
  6. Only then consider a board-designated reserve draw or short-term facility, and only after the sustainable gap is quantified.

Criteria. May cut: discretionary, reversible, non-compliance-linked, and with no service-level consequence inside twelve months. May not cut: anything tied to licensure, accreditation, mandatory training, patient safety, or grant deliverables; anything that creates a larger future liability than the saving; and anything that would breach a funder condition.