PCAM study materials
PCAM study resources

PCAM: Reliability, Resilience, and Disaster Recovery

PCAM ยท Work through your exam, one topic at a time.

All guide sections

Reliability, Resilience, and Disaster Recovery

Reliability, Resilience, and Disaster Recovery

This domain covers service level objectives and error budgets, failure-domain analysis, the DR pattern ladder, and - critically - how you prove any of it works. Scenarios typically state an RTO and RPO with a budget constraint and expect you to pick the cheapest pattern that satisfies both.

SLOs and error budgets

  • An SLI is the measured indicator (success rate, p99 latency); an SLO is the target over a window (99.9% over 30 days); the error budget is 1 minus the SLO.
  • The error budget policy is a governance agreement: when the budget is exhausted, feature releases pause and reliability work takes priority.
  • Alert on user-visible symptoms using burn rate, not on raw resource thresholds that fire without customer impact.

Failure domains and patterns

  • Zone, then region, then account or project, then global control plane. Each level needs its own plan and its own credentials.
  • The DR ladder: backup and restore (hours), pilot light (minutes to hours), warm standby (minutes), active-passive multi-region, active-active (seconds, highest cost and complexity).
  • Pick the cheapest rung that meets both RTO and RPO; anything more is spend without benefit.
  • Resilience primitives: health checks with automatic replacement, retries with exponential backoff and jitter, circuit breakers, bulkheads, queue-based load leveling, graceful degradation.

Worked example

RTO 60 minutes, RPO 5 minutes, budget allows roughly 1.6x single-region cost. Backup and restore gives an RPO in hours and fails. Active-active gives an RPO near zero but costs 2.5โ€“3x and exceeds the budget. Warm standby fits: the full stack runs at minimum capacity in a second region, asynchronous replication keeps lag under five minutes, and a global load balancer performs scripted failover. Pre-test the post-failover scale-up so the RTO lands at 20โ€“40 minutes. Rehearse quarterly - an unrehearsed failover usually blows the RTO on the first real attempt.

Traps that cost marks

  • Stating an RPO without a way to measure replication lag against it.
  • A DR plan that depends on the same identity or control plane that failed.
  • Retries without backoff, turning a transient blip into a retry storm.
  • Never failing over on purpose; game days and controlled experiments are the only credible evidence.