The Gas Switch and the Thick Production Joint
A fabricator is using a WPS/PQR for FCAW-G on a new project. The PQR was made on 1/4-in. A36 plate with 0.045-in. E71T-1, 75% Ar/25% CO2, 28 V, 250 A, 12 ipm, and states a qualified base-metal thickness range of 1/16 to 1/2 in. Production is a 1-in.-thick A572 Grade 50 complete-joint-penetration groove weld in a moment frame. To reduce cost, the foreman changed the shielding gas to 100% CO2 and did not revise the WPS. The welder's performance qualification is for FCAW-G on a 3/8-in. test plate and states a qualified thickness range of 1/8 to 3/4 in. The joint is being welded with a 60-degree included angle, root gap 1/4 in., and no preheat is specified. The first two production welds have been completed and the third is in progress when you arrive. The contractor argues that FCAW is FCAW and the welds look fine.
1. Identify the qualification deficiencies and state whether production can continue.
Read the worked answer
Production cannot continue as written. The first deficiency is the shielding gas: for gas-shielded FCAW, shielding gas composition is an essential variable in procedure qualification. Changing from 75% Ar/25% CO2 to 100% CO2 changes arc characteristics, penetration, and diffusible-hydrogen behavior, so the existing PQR and WPS do not cover the production weld. The second deficiency is thickness: the PQR qualifies base metal from 1/16 to 1/2 in., but production is 1 in.; the WPS is outside its qualified range. The third is welder qualification: the WPQ covers 1/8 to 3/4 in., but production is 1 in.; the welder is outside the qualified range. A fourth issue is that no preheat is specified for a 1-in. restrained moment connection; that may or may not be required by the qualified procedure, but the WPS must state it. The argument that FCAW is FCAW ignores the qualification system: the WPS is a controlled document, and the gas and thickness are not interchangeable without qualification.
2. What is required to resolve the WPS and welder qualification issues?
Read the worked answer
The contractor has two technical paths. One is to return to the qualified 75% Ar/25% CO2 gas and use a WPS that covers 1-in. thickness, which still requires a new PQR or an existing qualified PQR with a qualified thickness range that includes 1 in. The other is to qualify a new procedure with 100% CO2 on a coupon thick enough to cover 1 in.; the PQR must record the actual gas, wire feed speed, voltage, travel speed, preheat, interpass, and joint design. A new WPS is then issued from that PQR. The welder must be requalified on a test coupon whose thickness qualifies the production range, or the contractor must show an existing WPQ whose stated range includes 1 in. The completed production welds made outside the qualified WPS are nonconforming until evaluated by the engineer and examined by the required NDT; they cannot be accepted on appearance. The inspector should require an NCR, a revised WPS, and welder qualification records before the third weld resumes.
3. What immediate actions and documentation should you complete at the work station?
Read the worked answer
I would stop the third weld, have the welder secure the joint, and segregate the two completed joints with a hold tag. I would record the WPS number, PQR number, welder ID, gas cylinder label, flow rate, wire lot, joint location, and the time of the stop. I would photograph the gas regulator and cylinder label and obtain the contractor's gas change order or verbal instruction in writing. I would issue a nonconformance report citing the unqualified gas, thickness exceedance, and welder range exceedance, and route it to the contractor's QC manager and the engineer. I would not permit retest or repair welding on the two completed joints until the engineer defines the disposition. I would also verify that the third joint is not partially welded in a way that creates a crack-sensitive condition; if it is, the contractor should follow an approved interruption procedure. The daily report should state exactly what was observed, not merely that the WPS was not followed.