Mixed results in a gateway rollout

The repository has the intended hotfix. Two gateways report success and a third still shows the previous build.

1. What should the operator do before expanding the rollout?

Read the worked answer

Inspect the third target’s verification and installation tasks and exact platform/build. Reconcile the failure or pending state, then repeat the functional test before selecting more targets.