A university spends £22 million a year on facilities management across three campuses. The category has 210 suppliers: the top 12 account for 71% of spend; the remaining 198 average £32,000 a year and generate 1,900 invoices. Thirty-eight per cent of tail transactions are off-contract. The cleaning contract, worth £7.4 million, expires in 14 months; SLA performance is 91%, but staff turnover is 34% and there were two fire-door compliance failures last term. Estates wants a single bundled FM contract; finance wants 7% cashable savings within three years; the university has a 2035 net-zero target. The incumbent cleaning provider has offered a 4% reduction if the contract is extended for two years without competition. A new category manager starts next month.

1. Segment the category and set out a category strategy that addresses spend concentration, tail complexity and compliance risk.

Read the worked answer

Segmentation. The top 12 suppliers are not one group. Cleaning (£7.4m) is strategic because failure affects safety, compliance and student experience. Hard FM and security are likely leverage or strategic depending on market capacity. The 198-supplier tail is transactional: £6.4m of spend spread across low-value purchases, with 38% off-contract and 1,900 invoices. Treating all 210 as one category would over-manage the tail and under-manage cleaning.

Strategy by segment:

  • Cleaning: strategic, with a formal market test or negotiated renewal. The two fire-door failures and 34% turnover are warning signs that the SLA score alone is misleading. Require a workforce plan, training records, supervision ratios and compliance audit rights.
  • Top 12: consolidate where interfaces create real value, but benchmark each lot. Use should-cost models and joint business plans for the largest three.
  • Tail: reduce 198 suppliers to a controlled panel or catalogue, with purchase cards and delegated limits. Target a 40% reduction in invoices and a 25% reduction in suppliers within 12 months; that is operational savings and improves visibility.

Category plan: data cleanse, demand management, specification review, contract compliance, sustainability criteria and a 36-month sourcing pipeline. The 7% cashable target needs a bottom-up bridge, not a blanket percentage. The new category manager should spend the first 60 days validating spend data and meeting campus stakeholders before committing to a bundling decision.

2. Evaluate the estates director’s proposal for a single bundled FM contract against the incumbent’s two-year extension offer.

Read the worked answer

Bundling can create value where interfaces are the main cost driver - cleaning, security, maintenance and grounds often overlap. It can also reduce the university’s ability to benchmark, lock in a poor performer and make the university dependent on one provider’s subcontractor chain. The cleaning compliance failures are exactly the kind of issue that a single contract can hide unless the specification and audit rights are strong.

The incumbent’s offer is a 4% reduction for a two-year extension without competition. That is worth about £296,000 a year on £7.4m, but it buys peace rather than value. It removes market tension, may preserve an underperforming workforce model and does not address turnover or fire-door compliance. It should not be accepted as offered.

Judgement: test the market before deciding. Run a structured options appraisal: fully bundled single provider; bundled hard FM with separate cleaning; or a lead-provider model with specialist lots. Compare total cost of ownership, transition risk, market depth, TUPE/transfer implications, service continuity and carbon impact. If the market test shows weak competition, a negotiated renewal with the incumbent may be sensible - but only with a 4% reduction, a workforce plan, compliance KPIs and a break clause. Do not let the 14-month expiry force a premature bundling decision; use the time to build evidence.

3. Propose the savings and sustainability levers needed to deliver 7% cashable savings without undermining service quality.

Read the worked answer

Savings bridge. Seven per cent of £22m is £1.54m a year by year three. It should come from several levers, not one aggressive contract cut:

  • Tail consolidation: £6.4m tail spend; removing 38% off-contract purchasing and cutting invoices could release 3–5% through catalogue pricing and reduced administration - roughly £200k–£320k.
  • Demand management: space utilisation, cleaning frequencies by zone, energy-linked maintenance and print/consumables reduction. Target £250k–£350k.
  • Cleaning re-specification: outcome-based standards and productivity review rather than a blunt headcount cut. Target £300k–£450k, but protect fire-door checks and out-of-hours cover.
  • Benchmarking and lot-level competition: 2–4% on hard FM and security - £200k–£400k.
  • Contract compliance: recover overpayments and enforce SLA credits - £100k–£150k.

Sustainability. The 2035 net-zero target requires carbon criteria in specifications, not just a supplier questionnaire. Include fleet electrification, chemical reduction, waste segregation, energy management and fair-work standards. The 34% cleaning turnover is a sustainability and service-quality issue: require a pay, progression and training plan, and monitor it quarterly.

Guardrails: no savings lever should reduce statutory compliance, fire safety or accessibility. Report cashable savings net of transition and contract-management cost, and track service quality alongside the savings to avoid a false economy.