CISI Global Securities Operations study materials
CISI Global Securities Operations study resources

Block Trade Confirmation Breaks Before Tokyo Affirmation

CISI Global Securities Operations · Put your knowledge to work in context.

All case studies

Block Trade Confirmation Breaks Before Tokyo Affirmation

On Tuesday 12 March a London-based investment manager executes a sale of 450,000 shares in a Japanese listed company on the Tokyo Stock Exchange at an average price of ¥2,345. The order is a block allocation across three sub-funds: 200,000 / 150,000 / 100,000. Tokyo settlement is T+2. The broker's confirmation arrives at 09:10 London time on 13 March showing the correct total quantity and price, but a settlement date of 15 March, commission of 12 basis points rather than the agreed 10 basis points, and the 100,000-share allocation marked as a give-up to a different custodian. The manager's affirmation deadline is 17:00 JST on 14 March. The operations team has already released the trade to its own custodian for settlement. The portfolio manager is travelling and cannot approve changes until late on 13 March.

1. Identify each break in the broker confirmation and explain why it matters for affirmation and settlement.

Read the worked answer

Compare the confirmation against the executed order on the four matching pillars: quantity, price, settlement date and commission, then check allocation and standing settlement instructions.

  • Quantity and price: 450,000 at ¥2,345 matches the order management system, so the economic core is agreed.
  • Settlement date: the confirmation shows 15 March; T+2 from 12 March is 14 March. This is a value date break. If affirmed, the firm's custodian may deliver or fund on the wrong date, creating a fail on 14 March and exposing the trade to buy-in or cash penalty.
  • Commission: 12 bp against 10 bp is a cost break of 2 bp. On ¥1,055,250,000 that is ¥211,050. Affirming it would accept an unauthorised cost and could breach the client's fee agreement or best-execution obligations.
  • Give-up: the 100,000 allocation is marked to a different custodian. A give-up needs a valid instruction from the executing broker to the receiving broker and matching settlement instructions. Without acceptance, the receiving broker may reject the line or settle against the wrong account.
  • Allocation: 200,000 plus 150,000 plus 100,000 equals 450,000, so the allocation itself is not a break.

The confirmation should not be affirmed in full until the date, commission and give-up fields are corrected or explicitly agreed in writing.

2. Set out the actions and escalation you would take before the 17:00 JST deadline, in priority order.

Read the worked answer

Priority 1 is protecting settlement. Call the broker's confirmation desk immediately, quote the trade reference and request an amended confirmation with settlement date 14 March. At the same time ask the custodian whether it can settle on 14 March if the broker's confirmation is corrected, and whether the original release can be held or amended. Do not let the original confirmation drive matching.

Priority 2 is the give-up. The 100,000 line requires the executing broker to send a give-up instruction to the receiving broker and the receiving broker to accept it. Check that the give-up agreement is in place and that the receiving custodian's settlement instructions are correct. If the receiving broker has not accepted before the deadline, either settle the line through the original custodian or escalate to the head of operations for a decision.

Priority 3 is commission. Ask for the agreed 10 bp schedule and a corrected commission. If the broker refuses, escalate commercially, but do not delay the settlement-critical fields.

Escalate to the duty manager and to a delegated approver for the travelling portfolio manager. Record all calls and emails. Keep the affirmation status unmatched until the material fields are corrected. If the broker cannot amend before the deadline, affirm quantity and price but flag the date and commission as disputed in writing, while making sure the settlement instruction reflects the correct date.

3. What control failed and what would you change?

Read the worked answer

The failure is not a single error but a weak pre-affirmation control environment.

  • Commission was not checked against a static schedule in the order management system, so a 2 bp overcharge reached the confirmation stage. A pre-confirmation rule should flag any commission outside the agreed grid.
  • The give-up was not captured at allocation. The order system should require a valid give-up agreement and receiving broker instructions before the allocation is released.
  • The settlement date was not independently derived. The firm should calculate T+2 from the exchange calendar and compare it automatically rather than rely on the broker.
  • Affirmation was manual and the trade was released before matching. A four-eyes check and a hard stop on unmatched material fields would prevent release.

A root-cause review should also ask why the portfolio manager was uncontactable without a delegated approver. The control owner should be operations, with a monthly sample test of confirmations for commission, settlement date and give-up accuracy.