You supervise 14 welders across two shifts at a pressure-piping shop. Ray has 22 years in, holds the 6G tickets, and is the only welder who can run the chrome-moly spools; the schedule leans on him daily. Six months ago Dana joined as CWI. Last week Dana flagged Ray's root pass on a 6 in. spool: reinforcement above the profile limit, and Ray had turned the machine up from 95 A to 130 A on a WPS qualified 90-110 A. Ray told the fitter that "the inspector has never held a stinger," and in the ten days since, two younger welders have also started running hot. Dana has stopped walking the bay and now reviews radiographs from the office. Ray's last 30 welds passed visual and RT. The 40-spool order is three days behind, shipping to a refinery turnaround where late delivery carries liquidated damages of $2,500/day. The shop superintendent wants you to "get Dana off Ray's back" so the order ships.

1. Is Dana right? Assess the status of Ray's welds and what is actually at stake.

Read the worked answer

Dana is right, and the passing radiographs do not make the welds conforming.

Amperage is an essential variable in a qualified WPS. Welding at 130 A against a 90-110 A range means the weld was not made under the qualified procedure - it is nonconforming regardless of how it looks on film. RT finds volumetric and crack-like discontinuities; it does not measure heat input, hardness, or toughness, which is precisely what an amperage excursion changes on chrome-moly. On a P-No. 4 or 5 material, elevated heat input can shift hardness and cracking susceptibility in ways that show up in service, not on a radiograph.

So the disposition is not "Ray's welds are fine." It is a documented review of those welds against the WPS - heat input calculation, and hardness testing where the WPS or customer requires it - followed by engineering acceptance or repair.

The wider exposure is worse than one spool. Two younger welders have copied the practice, which makes this a systemic escape, and the superintendent's request asks you to trade a code violation for schedule on work headed into a refinery turnaround. That is the decision that ends up in a hearing, not a production meeting.

2. How do you handle Ray - the conversation, the consequences, and keeping a scarce welder?

Read the worked answer

Private, data-first, and consistent with how you would treat anyone else.

  • Open with the skill, not the defect. Ask what drove the change: production pressure, a machine that will not hold arc at 95 A, or a root fusion problem he was solving. The answer determines whether the fix is procedural or equipment.
  • Then be explicit that the amperage is the issue, not his ability. The WPS range is not a suggestion, and the shop superintendent's support does not change it. Use the handbook's ladder - documented coaching, written warning, then suspension - and set a follow-up date.
  • Apply it to the two welders who copied him as well, at a lesser level but still documented. If the crew sees that only the senior man was spoken to, they learn the rule is discretionary.
  • Keep him, deliberately. He is a scarce 6G chrome-moly resource; losing him over this would be a self-inflicted wound. Consider giving him the heat-input and machine-setup training role for the younger welders, which turns his speed into the standard instead of the exception.
  • Remove the incentive. If the qualified range genuinely costs time, the route is a new procedure qualified at higher amperage through engineering, not a floor decision at the machine.

3. How do you rebuild Dana's authority and stop the practice from spreading, including with the superintendent?

Read the worked answer

Authority is rebuilt in public and in front of the crew, not in a memo.

  • Walk the bay with Dana this week and be seen doing it. When a welder pushes back, the answer comes from you: hold points are hers, and disputes route to the supervisor, not to the fitter.
  • Restore the visible standard: post the qualified amperage, voltage and travel range at each chrome-moly station, and put the heat-input calculation on the wall where the machine settings are made. Ambiguity is what let 130 A look reasonable.
  • Retrain the two welders who copied the practice, and say why to the whole crew - code, customer specification, and the refinery turnaround. People follow a rule they understand faster than one they are told about.
  • Take the superintendent the numbers, not the principle. A rejected spool and a re-test costs more than a few days of liquidated damages at $2,500/day, and a weld that fails in a turnaround is a lost account. Offer the recovery plan at the same time: resequence non-code work, add a Saturday shift on the manual spools, and protect the hold points.
  • If the direction persists after that conversation, escalate in writing. Backing the inspector is the supervisor's job; letting the crew watch her be overruled is how a quality system quietly stops working.