Oven capacity and a hotel contract at Anatolia Bakery

Pancyprian TS Bus. Org. · Put your knowledge to work in context.

All case studies

Oven capacity and a hotel contract at Anatolia Bakery

Anatolia Bakery produces 1,200 loaves a day for local retailers using two ovens. Each oven can bake 400 loaves per eight-hour shift; the bakery runs two shifts, but changeovers and cleaning consume 90 minutes per oven per day. A hotel group offers a contract for 600 extra loaves per day, five days a week, at €0.85 per loaf; the current average price is €1.10. The bakery's contribution margin is 35%. Overtime is already 12%, and the ovens are the bottleneck. Quality checks are visual, and customer complaints about underbaked loaves rose from 0.8% to 2.1% last quarter. The operations manager wants to accept immediately; the finance manager warns that the contract price may not cover the true cost. The bakery has space for a third oven but no capital approval until next year.

1. Calculate the bakery's realistic oven capacity and determine whether the hotel contract can be fulfilled without a third oven. State your assumptions.

Read the worked answer

Each oven runs 8 hours = 480 minutes and produces 400 loaves, so output is 50 loaves per oven-hour. Two ovens × two shifts = 32 oven-hours per day. Cleaning and changeover use 90 minutes per oven per day = 3 oven-hours, leaving 29 oven-hours. Capacity = 29 × 50 = 1,450 loaves per day. Current output is 1,200, leaving 250 spare. The contract needs 600, so the shortfall is 350 loaves per day.

Ways to close the gap: add a partial third shift of 7 oven-hours; reduce changeover by 30 minutes per oven, recovering one oven-hour (50 loaves); improve yield; or outsource part of the contract. Overtime at 12% suggests labour is already stretched.

Judgement: do not accept the full 600 immediately. A phased commitment of 250–300 loaves is feasible with a partial shift and shorter changeovers, subject to labour availability and a quality trial. The full 600 requires a third oven, outsourcing, or a longer operating day.

2. Evaluate the financial attractiveness of the €0.85 contract. Include an incremental contribution calculation and identify the information that is missing.

Read the worked answer

Revenue is 600 × €0.85 × 5 = €2,550 per week. At the existing 35% contribution margin, contribution is €892.50 per week, or about €46,410 per year over 52 weeks. However, the 35% average may not apply: overtime premium, extra energy and lower yield at higher volume could reduce it. Incremental fixed costs - a partial-shift supervisor, maintenance and possibly delivery - must be deducted. If those costs are €500 per week, contribution falls to €392.50 per week, still positive but thin.

The contract price is below the €1.10 average. It is acceptable only if it uses otherwise idle capacity and does not displace full-price sales. Missing data include variable cost per loaf at the higher volume, the overtime wage premium, changeover cost, contract penalties, seasonality and the hotel's payment terms.

Judgement: negotiate €0.90–0.95 or a smaller initial volume. Accept only if incremental contribution exceeds incremental fixed costs and a quality trial is passed; otherwise reject or outsource.

3. Recommend operational controls to protect quality while increasing volume.

Read the worked answer

Introduce statistical process control on oven temperature and baking time, with hourly temperature logs and calibrated probes. Add random batch checks for core temperature, weight and colour. Require a 30-minute first-batch approval before the hotel order is released. Track complaints per 1,000 loaves with a target below 1%, and use root-cause analysis for underbaked batches.

Schedule contract batches at the start of a shift, not at the end when ovens are cooling. Reduce changeover by pre-scaling ingredients and preparing tins in advance. Reserve a 10% capacity buffer and do not run ovens above rated load. Train relief staff and separate trial batches from normal production.

Governance: a daily 10-minute production meeting and a weekly KPI review covering yield, complaints, overtime and on-time delivery. Judgement: quality, not only oven hours, is the binding constraint. Run a four-week trial of 200 loaves per day before accepting full volume; a rejected hotel batch would damage reputation more than the contract is worth.