Below an abandoned pyrite mine in the Río Tinto headwaters, a 40 L/s stream has pH 2.9, Fe 350 mg/L, sulfate 2,800 mg/L, As 0.15 mg/L and Cu 8 mg/L. Upstream, pH is 6.8 and Fe is 2 mg/L. During storms, flow doubles and pH rises to 3.4; in summer, flow falls to 12 L/s and pH falls to 2.6. The stream drains into a reservoir used for irrigation. Three options are proposed: (A) an anoxic limestone drain, (B) a constructed wetland with sulfate-reducing bacteria, (C) lime dosing with sludge management. The site has a 3% slope and 500 m² available; the water is sulfate-rich; limestone is local but gypsum precipitation is expected. The budget covers construction but not indefinite operation.
1. Identify the main reactions that generate acidity and control iron, arsenic and copper mobility. Why does pH rise during storms but fall in summer?
Read the worked answer
Pyrite oxidation generates acidity: FeS₂ + 3.5O₂ + H₂O → Fe²⁺ + 2SO₄²⁻ + 2H⁺. Ferrous iron is then oxidized to ferric iron, which hydrolyses and precipitates as schwertmannite, jarosite or ferrihydrite, releasing more protons. At pH below about 3.5, ferric iron remains relatively soluble and arsenic can be released from iron oxides; copper remains mobile as Cu²⁺. Sulfate is conservative and reflects the extent of sulfide oxidation. During storms, dilution raises pH and lowers dissolved concentrations, but stored oxidation products and efflorescent salts can be flushed, causing a temporary metal pulse. In summer, low flow concentrates solutes and reduces dilution; longer residence time and continued pyrite oxidation lower the pH to 2.6. The reservoir is at risk because irrigation water with high sulfate, iron and copper can damage soils and crops. Monitoring must therefore include storm events, not just baseflow.
2. Compare the three remediation options and recommend a staged plan that respects the flow, sulfate load, available area and operating budget.
Read the worked answer
Option A, an anoxic limestone drain, is cheap and passive, but ferric iron and aluminium hydroxides will armour the limestone, and sulfate-rich water will precipitate gypsum on its surface. It works best after iron has been removed and under anoxic conditions, so it is not a stand-alone solution at pH 2.9 with 350 mg/L Fe. Option B, a constructed wetland, can generate alkalinity through sulfate reduction and remove metals as sulfides, but the iron load is enormous: 350 mg/L × 40 L/s is about 14 g/s, or more than 1 tonne per day. A 500 m² wetland is far too small, and sulfate reduction is inhibited at low pH. Option C, lime dosing, is robust and can raise pH rapidly, precipitating iron and gypsum, but it produces large volumes of sludge and has high operating costs. A staged plan should begin with source control: divert clean water, seal mine openings and cover reactive waste. Then use lime dosing for high-flow capture and pH adjustment, followed by settling ponds and a passive limestone or wetland polishing stage. The budget must include sludge disposal and long-term monitoring; relying on a single passive system would fail.
3. Design a monitoring programme to judge whether the remediation is working and to protect the irrigation reservoir.
Read the worked answer
Monitor upstream, at the mine discharge, after each treatment stage and at the reservoir inlet. Measure flow, pH, electrical conductivity, dissolved oxygen, Eh, turbidity, Fe(II) and total Fe, sulfate, As, Cu, Zn and suspended solids. Sample at least weekly during baseflow and during storms, because storms mobilise stored salts and sludge. Include sediment and biofilm sampling for arsenic and copper, since metals can accumulate and later be released. Install piezometers to check that contaminated water is not bypassing the treatment system. Set performance criteria: pH above 5.5, Fe below 5 mg/L, As below 0.01 mg/L and Cu below 0.1 mg/L at the reservoir inlet, subject to local irrigation standards. Monitor sludge volume and composition, and test for leaching before disposal. Report results against upstream baseline and flow-weighted loads, not just concentrations, because dilution can mask continuing contamination. If criteria are not met, the lime dose or residence time must be increased.