ETiCPA ATQE Exam: Audit Planning, Scoping and Risk Assessment

ETiCPA ATQE Exam · Work through your exam, one topic at a time.

All guide sections

Audit Planning, Scoping and Risk Assessment

Domain 3 tests how you turn an annual plan into a specific engagement: what question you will answer, where the boundaries lie, what criteria you measure against, and how risk drives the depth of work.

From the audit universe to the annual plan

  • Score the universe on change, complexity, transaction volume, regulatory exposure, third-party dependency and prior findings.
  • The risk-based plan goes to the audit committee for approval; the charter and engagement letter supply authority and access.

Objectives, scope and criteria

  • An objective is a question, for example: are access controls over the payroll system designed and operating to prevent unauthorised payments?
  • Scope sets boundaries (entities, locations, applications, infrastructure, period, processes) and states exclusions explicitly.
  • Criteria are the yardstick: policy, regulation, COBIT or ISO requirements. A finding without criteria is only an opinion.

Risk-based scoping

  • Start from significant business processes and accounts, identify supporting applications, interfaces, reports and infrastructure, then confirm with walkthroughs.
  • Include shared service centres, cloud providers, end-user computing and any report a control depends on (information produced by the entity).
  • Set materiality for financial and non-financial dimensions; performance materiality is lower than overall materiality.
  • Assess whether other assurance providers can be relied on. Competence, objectivity, scope and timing must all be documented.
  • Hold a fraud-risk discussion that covers management override.

Worked example

An ERP upgrade goes live mid-year with a three-month parallel run. The objective covers completeness and accuracy of migration and change control over the new environment. Scope: migration events, interfaces feeding the general ledger, the parallel reconciliation, and change management for the go-live window; the marketing website is excluded and the exclusion is stated. The parallel-run reconciliation is in scope because it is the control that detects migration error. Reasoning: scope follows the risk of material misstatement, not the size or visibility of the project.

Traps

  • Writing procedures where objectives belong.
  • Silent scope creep: testing beyond the stated population and reporting it as if in scope.
  • Relying on another assurance provider without a documented assessment.
  • Planning from last year's file instead of a current walkthrough.
  • Setting materiality as a single number with no rationale.