A hillside above a mountain road is underlain by 3–5 m of clay-rich colluvium over fractured sandstone. The slope is 28°. In 24 hours, 120 mm of rain falls. A piezometer installed 2.5 m below the surface shows pore pressure rising from 4 kPa to 22 kPa over 36 hours. Tension cracks 0.5 m deep have opened near the crest, and a spring at the toe that normally runs clear is now muddy. A tiltmeter records 3 mm of downslope movement in 12 hours. The road below carries school buses. The weather forecast calls for 40 mm more rain in 6 hours. The colluvium has a permeability of about 10^-7 m/s, while the sandstone is fractured and drains more freely. The county geologist must choose between closing the road now, installing horizontal drains, or continuing monitoring with hourly readings.

1. Interpret the monitoring data in terms of effective stress, permeability, and slope stability. Explain why the muddy spring and tension cracks matter.

Read the worked answer

Slope stability depends on effective stress, (\sigma'=\sigma-u). The pore-pressure rise from 4 kPa to 22 kPa reduces effective normal stress on potential slip surfaces by about 18 kPa. That lowers frictional resistance while the rainwater also adds weight, so the factor of safety (F_s=\tau_{\text{resisting}}/\tau_{\text{driving}}) moves toward 1. The clay-rich colluvium has low permeability (10^-7 m/s), so water cannot drain quickly; it builds a perched water table and high pore pressures. The tension cracks are not cosmetic: they provide direct infiltration pathways and can hydrofracture the crest. The muddy toe spring indicates that subsurface flow paths have changed and that fine particles are being eroded internally, which can remove material and increase permeability along seepage paths. The 3 mm of movement in 12 hours shows the slope is already deforming, not merely saturated. Together these are signs of a slope near or at failure.

2. Recommend an immediate action and justify it against the alternatives. Include the reasoning you would give the county engineer.

Read the worked answer

Close the road and restrict access now. The slope has already moved 3 mm in 12 hours, pore pressure is rising, tension cracks are open, and 40 mm more rain is forecast. A school bus route cannot be treated as a monitoring experiment when failure could occur within hours. Horizontal drains are a reasonable long-term mitigation in fractured sandstone, but drilling into an actively moving, low-permeability clay slope is slow and could trigger failure; drains may also be ineffective because the colluvium transmits water slowly. Hourly monitoring is insufficient because the movement rate and forecast rain leave too little evacuation time. The engineer should close the road, post a geotechnical watch, and plan instrumentation and drainage after the storm. Any reopening should require stable tilt readings, falling pore pressure, and a documented factor-of-safety analysis.