GCAA Ghana ATPL Theory study materials
GCAA Ghana ATPL Theory study resources

Wet Runway and the Second-Segment Obstacle

GCAA Ghana ATPL Theory · Put your knowledge to work in context.

All case studies

Wet Runway and the Second-Segment Obstacle

A twin-engine narrow-body jet with a structural MTOW of 69 000 kg is planned out of a runway where TORA, TODA and ASDA are all 2 400 m. Elevation is 1 350 ft, QNH 1009, OAT 33 °C. Planned take-off mass is 61 800 kg. From the flight manual: dry accelerate-stop distance at 61 800 kg is 2 150 m; a wet runway increases accelerate-stop distance by 15 percent; take-off distance required increases by 60 m per 1 000 kg of mass; lowering V1 from 148 kt to 140 kt shortens accelerate-stop distance by 90 m but lengthens the take-off distance to 35 ft by 120 m. Dry take-off distance required to 35 ft is 2 180 m; on a wet runway this is unchanged (no aquaplaning assumed). The second-segment gross gradient at 61 800 kg and 30 °C is 3.2 percent; net gradient is gross minus 0.9 percent; it decreases 0.10 percent per °C above 30 °C and improves 0.15 percent per 1 000 kg below 61 800 kg. The net flight path must clear, by the standard 35 ft (10.7 m), an obstacle 60 m above the runway end located 3 000 m from the point where 35 ft is reached.

1. Is the take-off at 61 800 kg legal on the wet runway with V1 at 148 kt? Show the field-length reasoning and what the crew must change.

Read the worked answer

Accelerate-stop check. Dry accelerate-stop distance 2 150 m; wet factor 1.15 gives 2 472 m against an ASDA of 2 400 m. The take-off is not legal at V1 148 kt: there is insufficient runway to stop from an engine failure at V1 on the wet surface.

Corrective action - reduce V1. Lowering V1 to 140 kt gives a dry accelerate-stop distance of 2 150 − 90 = 2 060 m, and wet 2 060 × 1.15 = 2 369 m, inside 2 400 m with 31 m to spare.

But V1 is a two-sided decision. A lower V1 makes stopping easier and continuing harder. The take-off distance must be rechecked: 2 180 + 120 = 2 300 m to 35 ft, inside the 2 400 m TODA with 100 m to spare. So the field length is satisfied, but only just, and the margin is now small enough that any change - a tailwind, a later line-up, another 1 000 kg - invalidates it.

What the crew must do. Recompute with the actual wind and temperature at the time of take-off, not with the flight-plan figures; brief the reduced V1 and the fact that the stop decision now comes earlier and at lower speed; and confirm that no other limit (tyre speed, brake energy) is exceeded by the higher V1 rejected case. V1 must never be raised to make the second segment work - that is the classic way to fail the stop case.

2. Does the net flight path clear the obstacle? Show the calculation and the remedy.

Read the worked answer

Gradient required. The net flight path starts at 35 ft (10.7 m) and must clear the obstacle by 35 ft: required rise = 60 + 10.7 = 70.7 m over 3 000 m = 2.36 percent.

Gradient available. Gross 3.2 percent; net = 3.2 − 0.9 = 2.3 percent. OAT is 33 °C against the 30 °C of the chart, i.e. 3 °C above, costing 3 × 0.10 = 0.30 percent. Net available = 2.3 − 0.3 = 2.0 percent.

Result. 2.0 percent available against 2.36 percent required: the net flight path is about 11 m short at the obstacle. The take-off is not legal on this departure at 61 800 kg, even though the runway lengths now work.

Remedies, in order of preference.

  • Reduce mass: at 0.15 percent per 1 000 kg, a 0.36 percent deficit needs about 2 400 kg, so roughly 59 400 kg. This also improves the field length.
  • Use an alternative departure procedure (a turning departure that avoids the obstacle, or a displaced start point) if one is published and the aircraft can fly it.
  • Wait for a lower OAT, which recovers 0.1 percent per °C.

Note the trap: the mass reduction is driven by the obstacle, not the runway, and a crew that only fixed the wet-runway V1 problem would depart illegally. Note also that ISA at 1 350 ft is about 13 °C, so 33 °C is roughly ISA +20 - performance is degraded on both counts.

3. The crew considers an intersection departure to save taxi fuel. How does that change the analysis and what is the governing principle?

Read the worked answer

It changes three things, all in the wrong direction.

  • TORA/TODA/ASDA shrink. The declared distances for the intersection are shorter than 2 400 m, so the 2 369 m wet accelerate-stop distance and the 2 300 m take-off distance may no longer fit - the field-length margin that was already only 31 m and 100 m would disappear.
  • The obstacle moves closer in flight-path terms. The net flight path is measured from where 35 ft is reached, and with a shorter TODA the aircraft reaches 35 ft earlier along the physical runway, so the horizontal distance to the obstacle is reduced and the gradient required rises. A 300 m loss of take-off run at 3 000 m turns a 2.36 percent requirement into about 2.6 percent.
  • The screen height may not be achievable within the remaining TODA at all, which is a field-length failure, not just an obstacle failure.

Governing principle. Every take-off must satisfy the field-length, obstacle and climb requirements simultaneously and in the configuration actually used, with the declared distances for the actual entry point. An intersection departure is a new performance calculation, not a fuel-saving tweak; the correct answer here is to use the full length, and to accept the taxi burn.