Hawaii CDL General Knowledge study materials
Hawaii CDL General Knowledge study resources

Rebar on the Flatbed: Tiedown Math Before the Windward Run

Hawaii CDL General Knowledge · Put your knowledge to work in context.

All case studies

Rebar on the Flatbed: Tiedown Math Before the Windward Run

At a Kapolei yard you are loading a 48-foot flatbed with six bundles of 20-foot #5 rebar, each bundle weighing 1,600 lb, for delivery over the Kamehameha Highway to the windward side, where the afternoon forecast calls for 25 mph crosswinds. Your equipment: eight 2-inch ratchet straps rated at 5,400 lb working load limit, four chains with binders rated at 4,700 lb working load limit, and no header board. The bundles are oily from the yard, and two stacks are stacked two high. The shipper's loader tells you the last driver used four straps total and 'never had a problem.' You are expected on the road in twenty minutes. The tractor's steer axle is rated 12,000 lb and the drive tandem 34,000 lb.

1. Using the length and weight rules, compute the minimum number of tiedowns for each 20-foot bundle and for the whole load, and check the aggregate working load limit requirement.

Read the worked answer

Length rule, per bundle. An article up to 5 feet needs one tiedown; 5 to 10 feet needs two; longer than 10 feet needs two plus one additional for each additional 10 feet or fraction. A 20-foot bundle: 2 + 1 = 3 tiedowns minimum per bundle.

Whole load: six separate bundles, six articles, so 18 tiedown points as a floor. You own 12 assemblies - eight straps plus four chains. The shipper's four straps is roughly a fifth of the minimum, and even the well-intentioned 'use all twelve' plan is short.

Aggregate working load limit rule: the combined WLL of the tiedowns on an article must be at least half the weight of the article. Per bundle: 1,600 lb ÷ 2 = 800 lb required. One 5,400 lb strap is nearly 7 times that; one 4,700 lb chain is nearly 6 times. So weight is not what binds here - the length and count rule is, plus the strap angles and the condition of the load.

The conclusion is not 'add a strap and go.' It is: get more tiedowns from the yard, or take fewer bundles. The rule minimum is 18 and you cannot meet it with what is on the deck.

2. You plan to run straps over the top at a shallow angle. How does that change your math, and what else about this load - oil, stacking, wind, no header board - changes your securement plan?

Read the worked answer

Angle. A tiedown's effective capacity depends on its angle to the deck. At 45 degrees you get roughly 70 percent of the rated WLL (about 3,800 lb from a 5,400 lb strap); at 30 degrees, roughly half (about 2,700 lb). Even the worst case is comfortably above the 800 lb per-bundle requirement, so angle does not fail the weight rule here - but it does mean a shallow, near-horizontal strap is doing very little to hold the load down, and it chafes over the bundle edges while doing it.

Oil. Oily steel slides. The friction the rule implicitly assumes is partly gone, so the bundles need more than the minimum tiedown count, or friction mats, or both. Under braking, oiled rebar shifts forward as a unit.

Stacking two high. The upper bundles must be secured to the lower ones, not merely to the deck - three tiedowns to the deck under a stack does nothing for the bundle riding on top of it.

No header board. Forward restraint then comes only from the straps' angle and tension. A header board or blocking at the front is the cheap fix.

Wind. A 25 mph crosswind on a 20-foot stack is a lateral load the tiedowns have to resist for two hours on an exposed highway. Add edge protection where straps cross steel, and inspect for chafe at every stop.

3. What are your inspection obligations once you are moving, and how do you handle the shipper's 'four straps' comment?

Read the worked answer

Inspection obligations: inspect the cargo and tiedowns within the first 50 miles of the trip, then again at least every 150 miles or every 3 hours, whichever comes first - and in practice at every stop you make. Rain, crosswind, and oiled steel are all reasons to check more often than the minimum. After the first 50 miles on a load like this, expect to re-tension; new straps stretch and oiled bundles settle.

The shipper's comment: the driver is responsible for the load being secured, regardless of who loaded it or what the last driver did. 'Never had a problem' describes the past, not the physics. Handle it factually and without argument: show the count - 20-foot articles need three tiedowns each, six bundles means 18, you have 12 - and ask for more straps, extra chains, or fewer bundles. Put the number in writing on the bill of lading or the dispatch note so the conversation is documented.

Do not sign for a load you cannot legally secure and then drive it. The roadside inspection, the citation, and the liability all land on the driver, and a shifting bundle of 20-foot rebar at 45 mph on the Kamehameha Highway does not care who was in a hurry. If the yard cannot supply the equipment, the load waits - that is a business problem, not a safety decision you are permitted to make the other way.