Safety, Grounding, Bonding, and Job-Site Practices
This domain tests safe work practices and the grounding and bonding rules that make fault clearing possible. Expect questions on OSHA, NFPA 70E, lockout/tagout, temporary power, approach boundaries, grounding electrode systems, equipment grounding conductors, and bonding.
Shock, arc flash, and job-site controls
- OSHA 1926 Subpart K covers construction electrical safety; 1910.147 covers lockout/tagout.
- NFPA 70E defines shock approach boundaries, the arc flash boundary, PPE, and the energized work permit.
- Test before touch with a properly rated meter; verify the meter on a known source.
- Construction sites require GFCI protection or an assured equipment grounding conductor program under 1926.404.
- De-energize, lock, tag, and verify before working.
Grounding and bonding
- 250.4 requires a permanent, low-impedance fault path capable of carrying fault current.
- 250.50 requires all grounding electrodes present to be bonded into one system.
- 250.52 lists electrodes: rods, pipes, plates, concrete-encased, ring, and metal water pipe with at least 10 ft in contact with earth.
- 250.66 sizes the grounding electrode conductor; 250.122 sizes the equipment grounding conductor.
- 250.24 covers service neutral bonding; 250.30 covers separately derived systems; 250.32 covers separate buildings.
- The neutral is the grounded conductor; the EGC is the grounding conductor; they are bonded only at the service or separately derived system.
Worked example
A 200 A service uses 2/0 copper service conductors. Table 250.66 requires a 4 AWG copper grounding electrode conductor. A 200 A feeder requires a 6 AWG copper equipment grounding conductor under Table 250.122. The reasoning: the GEC is sized from the service conductor size, while the EGC is sized from the overcurrent device rating. If the GEC is the sole connection to a rod, pipe, or plate electrode, 250.66(A) permits it not to be larger than 6 AWG copper.
Traps that cost marks
- Bonding neutral to ground at a subpanel.
- Using a ground rod as the only fault path instead of an EGC.
- Undersizing the EGC or omitting bonding of metal piping.
- Assuming conduit is an EGC without meeting 250.118.
- Using a non-contact tester as the only verification.
- Working energized without an energized work permit and correct PPE.