A 6.5 m deep storm drain manhole on a road in Kwun Tong has a 900 mm opening and a fixed ladder. Two workers are to remove silt and a plastic sheet blocking the drain. After overnight rain, water at the bottom is about 0.8 m deep and rising. A tripod is set over the manhole but has no winch line; a rope is tied to a nearby lamp post. The standby worker is also directing traffic 25 m away behind cones, and the radio is in the van. The entry worker says 'two minutes, no harness, the ladder is fine'. A permit signed for 'inspection only' is in the van. Readings taken with a 3 m sampling line at 1 m depth are O2 20.9%, LEL 0%, H2S 0 ppm. No bottom reading was taken. The downstream flow is controlled by a flap valve that a colleague says is 'probably closed'.

1. List the main hazards and explain why the 'two minutes, no harness' plan is unacceptable.

Read the worked answer

Hazards:

  • water and engulfment: 0.8 m and rising after rain, with a flap valve only 'probably closed'; a surge can trap or drown a worker;
  • fall from 6.5 m and ladder slip;
  • retrieval: no winch line, and a rope tied to a lamp post is not a rated anchor or retrieval system;
  • traffic: the standby is 25 m away directing traffic, so no one is at the entry;
  • atmospheric: no bottom reading, and drain silt can release H2S or methane; a 3 m line cannot sample the bottom;
  • communication: the radio is in the van.

The 'two-minute' plan is unacceptable because the permit is for inspection only, the hazard controls are absent, and a quick entry gives no time to react to a fall, gas alarm or water rise. A confined space entry must be planned for rescue, not for speed.

2. What sampling and monitoring must be completed before entry, and what equipment is needed?

Read the worked answer

Sample at the top, middle and bottom of the 6.5 m drain, including just above the water and near the silt, using a pump and extension tubing long enough to reach the bottom. Test for O2, LEL, H2S and CO at each depth; repeat after ventilation and during entry. Because this is a storm drain, methane and H2S are possible; if readings change with water flow, stop.

Equipment: calibrated multi-gas monitor with a pump, spare batteries, tripod with winch and fall-arrest harness for each entrant, retrieval line, rated anchor, portable blower and duct, radios, barriers and traffic control, and a rescue plan. No entry until the bottom reading is known and stable.

3. What changes are required to the permit, standby and rescue arrangements before any entry?

Read the worked answer

The permit must be reissued for the actual task, silt removal, not inspection. It must record isolation of the flap valve, positively closed and locked or controlled by a dam or plug, water-level monitoring, ventilation, sampling results, entry duration and evacuation triggers.

The standby must be dedicated at the manhole, trained, with a monitor and radio, and must not direct traffic; a separate traffic controller is needed. Rescue: tripod or winch with a harness on the entrant, a trained rescue team, a retrieval line, first aid and a clear 999 briefing. If the flap valve cannot be positively controlled or water is rising, do not enter; use remote or pumping methods.