IAI CSSA study materials
IAI CSSA study resources

Rain-Threatened Footwear Impressions on a Farm Track

IAI CSSA · Put your knowledge to work in context.

All case studies

Rain-Threatened Footwear Impressions on a Farm Track

At 06:40 on a cool, damp morning, a farmer reports a broken gate on a rural track. In the soft loam beside the gate you find six partial footwear impressions, each about 28 cm long, plus a mountain-bike tire track that crosses the clearest impression. A witness saw a person in a dark jacket leave the field toward a treeline about 20 minutes earlier. Light rain is forecast within 40 minutes. The scene has been protected only by a single officer's tape, and the track is used by farm vehicles. The impressions are shallow but show heel and tread detail. The temperature is 11 degrees C and relative humidity is 88 percent. The investigating officer asks whether to photograph first or cast immediately, and whether to cut out the soil block containing the tire overlay.

1. What should you do first, and how would you protect the impressions while deciding on casting?

Read the worked answer

Photograph first, but not slowly. The impressions are perishable because rain is coming and the track is in use. Take overall, mid-range, and close photographs with a scale and a north arrow; include the tire overlay in at least one frame. Record soil type, moisture, temperature, and light. Then protect the impressions with a temporary cover that does not touch the tread, such as rigid boxes or a tarp on supports, while you decide on casting. Do not let vehicles use the track; extend the tape to cover the approach. The single officer should start a scene log. Casting before photography would lose the spatial relationship and the overlay; photographing without covering risks losing detail to rain.

2. How would you cast the impressions in damp loam, and what setting-time and labeling issues apply?

Read the worked answer

For damp loam, use dental stone mixed to a thick slurry and pour from the uphill edge so it flows across the impression without displacing soil. Build a retaining wall of soil or cardboard around shallow impressions. The 11 degrees C temperature and 88 percent humidity will slow setting; allow at least 30 to 45 minutes before lifting, and longer if the cast is thick. Do not use plaster of Paris in wet soil if a stronger cast is needed; dental stone is preferred. Label the cast with case number, item number, location, orientation, and date. Photograph the cast after cleaning. If an impression is water-filled, gently remove water with a pipette or sponge before casting.

3. Should you cut out the soil block containing the tire overlay? Explain the trade-offs.

Read the worked answer

The tire overlay is evidence of sequence and possible contamination. Do not cut out the soil block immediately: first photograph and map the overlay relative to the shoe impression. If the shoe detail is only in the soil beneath the tire track, a soil block may preserve it, but cutting destroys the tire track's continuity. A better sequence is to cast the shoe impression and the tire track separately if they are distinct, or to cast the combined area and document the overlay. If the block must be removed, use a rigid frame, keep the block intact, and transport it without vibration. Record why the block was removed. The limitation is that casting cannot recover detail already destroyed by the tire.