IAI SP1 study materials
IAI SP1 study resources

IAI SP1: Integration, Verification and Validation

IAI SP1 · Work through your exam, one topic at a time.

All guide sections

Integration, Verification and Validation

Domain 7 tests integration, verification, and validation: assembling elements into a system, proving compliance, and proving fitness for use in the operational context.

Core rules and concepts

  • Integration combines elements according to an integration plan. Strategies range from big-bang to incremental; incremental generally reduces risk by exposing interface defects earlier.
  • Verification confirms that the system meets specified requirements: "did we build it right?" Validation confirms that it satisfies stakeholder needs in the operational context: "did we build the right system?"
  • V&V planning starts with requirements. Each requirement needs a method-inspection, analysis, demonstration, or test-and acceptance criteria.
  • Traceability links requirements to verification evidence and to validation scenarios.

Worked example

An aircraft landing-gear controller passes component tests. Integration reveals a timing conflict when the gear and brake systems share a bus. Verification catches the requirement violation. Validation later shows pilots can recover from the annunciation in a representative cockpit. Reasoning: component compliance cannot prove integrated behavior, and verification cannot prove operational fitness.

Traps that cost marks

  • Conflating verification and validation.
  • Leaving integration and V&V to the end of the program.
  • Testing without acceptance criteria or traceability.
  • Treating a successful demonstration as validation without operational context.
  • Declaring integration complete when interfaces are merely connected, not exercised.

Key points

  • Integrate incrementally to expose interfaces.
  • Verification checks requirements.
  • Validation checks needs in context.
  • Plan methods and criteria per requirement.
  • Trace evidence both ways.