A 5-ton rooftop packaged unit serves a 3,000 sq ft dental clinic. The clinic has had three episodes of musty odor in the past year, always worst in the morning. The air-handler interior insulation liner is dark-stained and peeling near the evaporator coil; the galvanized drain pan has standing water and biofilm; and the fiberglass duct board downstream of the unit has visible growth on the cut edges. The clinic sees patients from 8 a.m. to 5 p.m. and cannot close for more than one weekend. The practice owner asks whether the unit can be “shocked” with ozone over the weekend and returned to service Monday. The office manager is concerned about patient complaints and wants a written plan.

1. Evaluate the ozone proposal and describe the system remediation approach you would recommend.

Read the worked answer

Ozone should not be used as a mold remediation method in this system. Ozone is a respiratory irritant and can react with materials and indoor chemistry; it does not remove the moisture source, biofilm, or contaminated porous components. “Shocking” the unit over a weekend would leave the liner, drain pan, and duct board contamination in place and could expose patients and staff to ozone or reaction products on Monday.

A proper approach:

  1. Shut down and isolate the unit. Seal supply and return openings and establish containment around the air handler and affected ductwork. Prevent spores from being distributed to the clinic.
  2. Inspect the whole system. Check the coil, drain pan, liner, duct board, filters, and accessible ducts. Determine whether contamination extends beyond the unit.
  3. Remove contaminated porous components. Replace the damaged insulation liner and moldy duct board rather than coating or fogging them.
  4. Clean non-porous components. Clean the coil, pan, and cabinet with a method appropriate to the equipment, and correct the drain and slope so water does not stand.
  5. Dry and verify. Confirm the system is dry before restart, replace filters, and verify airflow and drainage.
  6. Investigate the morning odor pattern. It may reflect overnight moisture accumulation, a drain trap problem, or return-air pathways. Fix the cause, not just the smell.

2. Which components can be cleaned and which should be replaced? Explain the criteria.

Read the worked answer

The decision turns on porosity, condition, and whether the component can be cleaned to a visually clean and dry state.

  • Interior insulation liner: Replace. It is porous, dark-stained, and peeling. A damaged liner cannot be reliably cleaned and may release fibers.
  • Fiberglass duct board with visible growth on cut edges: Replace the affected sections. Growth on the cut edge penetrates the porous matrix; coating or fogging does not restore it.
  • Galvanized drain pan: Clean and repair or replace if corroded. Remove biofilm, confirm the drain is open and properly sloped, and eliminate standing water. A pan that cannot drain should be replaced.
  • Evaporator coil: Clean if fins are intact and accessible. Use a method that does not damage the coil or leave residue. If fins are crushed or the coil is heavily contaminated in inaccessible areas, replace it.
  • Cabinet and accessible sheet metal: Clean and dry if non-porous and intact.
  • Filters: Replace; they are not cleanable.

Document the condition of each component with photographs and the reason for replacement versus cleaning. When in doubt about a porous component, replacement is the conservative choice.

3. What verification and recurrence-prevention steps are needed before the clinic reopens Monday?

Read the worked answer

Reopening requires both remediation verification and confirmation that the system will not recreate the condition.

Verification:

  • Visual inspection of the air handler, coil, pan, duct board, and accessible ducts: no visible mold, dust, or debris; liner and duct board replaced where required.
  • Moisture check: no standing water in the pan, drain trap primed and flowing, and insulation dry.
  • HVAC operation: correct airflow, no musty odor at supply registers, and filters new.
  • Independent clearance if required by the project plan or owner. If air sampling is used, set criteria in advance and include an outdoor or unaffected-area comparison; sampling supplements visual verification.
  • Document with photos, component list, and moisture readings.

Recurrence prevention:

  • Correct the drain and slope, and add a maintenance schedule for pan cleaning and filter changes.
  • Investigate overnight humidity and return-air pathways; the morning odor pattern suggests moisture accumulates when the system is off.
  • Consider a condensate trap and drain-pan treatment appropriate for the equipment.
  • Give the office manager a written plan with the work completed, verification results, and maintenance intervals.

Do not return the unit to service on Monday unless these steps are complete; a weekend is enough only if replacements and verification are planned in advance.