A 30-barrel unitank holds a stout brewed to 1.058 OG, pitched four days ago with 6 kg of dry ale yeast rehydrated per the supplier's instructions. Gravity has sat at 1.026 for 72 hours at 60 °F; the glycol solenoid was found stuck open two days ago and has been reset. The beer tastes sweet and slick with a distinct buttered-popcorn aroma, and a forced diacetyl test on a warmed sample turns positive within 20 minutes. The cellar crew wants to oxygenate the tank and pitch another 10 kg of yeast to restart fermentation. Sales has a festival in nine days and has promised 25 barrels of this beer, and the tank is the brewery's only 30-barrel fermenter, with two more brews queued behind it.

1. What most likely happened, and why is oxygenating the tank a bad idea?

Read the worked answer

What happened. The glycol solenoid stuck open and pulled the tank far below the 60 °F setpoint. Ale yeast responds to a temperature crash by flocculating and going dormant; fermentation stopped with roughly 6.5 °P of extract still in the beer. Because yeast activity ceased, the α-acetolactate produced earlier was never reabsorbed and converted, so diacetyl is now free in the beer - which is exactly why the forced test goes positive within 20 minutes. The pitch rate itself was not the problem: 6 kg of dry yeast in 30 barrels is a generous pitch, so temperature is the leading cause unless records show poor viability.

Why oxygenating is wrong.

  • It does not help. The yeast population is already built. Oxygen is needed for sterol and lipid synthesis during the growth phase, not to restart a stuck fermentation, so you would be adding oxygen for no fermentation benefit.
  • It causes immediate staling. Oxygenating fermented beer drives oxidation of lipids and polyphenols and produces cardboard and sherry notes within weeks. The stout would arrive at the festival tasting old.
  • It invites contaminants. Oxygen plus residual sugar at warm temperature favors aerobic wild yeast and acetic acid bacteria.
  • It is unnecessary risk. The tank also has to be vented and handled, and oxygenating a carbonated tank creates foaming and loss of CO2.

The right lever is temperature, plus mechanical rousing, plus a fresh active pitch only if rousing fails.

2. Give a corrective plan, including what you would measure and when, and state the packaging release criteria.

Read the worked answer

Day 0–1: warm and rouse. Bring the tank to 68–70 °F and hold it there. Rouse gently with short CO2 bursts from the bottom port - brief, low-pressure, and repeated a few times a day, not a long blast that strips CO2 and foams the tank. Record gravity every 12–24 hours.

Day 2: escalate if nothing moves. If gravity has not dropped at least 2 °P in 48 hours, pitch an actively fermenting starter or krausen of a robust ale strain at roughly 1–2 million cells/mL, or rehydrate fresh dry yeast at a proper rate. Add yeast nutrient if the original wort analysis was marginal on FAN or zinc. Do not add oxygen.

Continue the warm rest until:

  1. Gravity is stable across 48 hours and at the expected final gravity (roughly 1.014–1.016 for this beer);
  2. The forced diacetyl test is negative - heat a sample to about 60–65 °C for 15–20 minutes, cool, and compare against an unheated control;
  3. Bench analysis shows total VDK comfortably under about 30–40 ppb. Tasters detect diacetyl near 0.1 mg/L, so aim well below that.

Then crash cool, crop yeast, and carbonate.

Release criteria. Do not package until gravity is stable and VDK is under spec. Packaging a beer with residual extract risks refermentation in the package - over-carbonated or bursting cans and kegs. Also verify no off-flavors from the stalled period before release.

3. The festival is in nine days and needs 25 barrels. How do you handle that commitment?

Read the worked answer

Be honest about the timeline. Best case: 1–2 days to warm and rouse, 2–4 days to finish the remaining extract, 2–3 days of warm rest to clear VDK, 1–2 days to crash and crop, 1–2 days to carbonate and check. That is 7–11 days with no slack, on a beer that has already failed once, in the brewery's only large fermenter - with two brews queued behind it.

Decision. Start the rescue immediately, but do not promise the festival beer from this tank. Commit an alternative now: existing packaged inventory, a different brand, or reallocating one of the queued brews. Tell sales today, not on day seven.

Set an explicit checkpoint. For example, on day 5 the tank must be at final gravity with a negative forced diacetyl test. If it is not, the festival gets the alternate and this beer is handled on its own schedule. Do not let a calendar date push a sweet, buttery stout into a glass in front of your best accounts - the damage lasts longer than one festival.

Fix the cause. Add a glycol solenoid alarm and a temperature-excursion log so a stuck-open valve is caught in hours rather than days; that single control is worth more than any rescue procedure.