III IC-72 study materials
III IC-72 study resources

Fire loss on a pharmaceutical plant: reinstatement value, underinsurance and a second fire

III IC-72 · Put your knowledge to work in context.

All case studies

Fire loss on a pharmaceutical plant: reinstatement value, underinsurance and a second fire

Shakti Pharma Ltd runs a tablet and capsule plant at Aurangabad. Its Standard Fire and Special Perils policy, running 1 April 2024 to 31 March 2025, carries a sum insured of ₹18 crore, the Reinstatement Value Clause, a deductible of 5% of each claim subject to a minimum of ₹1 lakh, and a 12-month reinstatement period. At inception the valuer engaged by the insurer assessed the reinstatement cost of the insured property at ₹24 crore, but the broker's declaration of ₹18 crore was accepted because it matched the bank's valuation for a term loan. Fire on 18 November 2024 destroyed the compression block and damaged the coating area. The licensed surveyor assesses the loss on a reinstatement basis at ₹6.40 crore, debris removal at ₹40 lakh, and the insured sells damaged equipment as scrap for ₹25 lakh. A second fire on 14 February 2025 damages the packing line, with a reinstatement loss of ₹1.10 crore. The insured argues that its sum insured was 'adequate on book value' and disputes averaging of the debris removal component.

1. Compute the amount payable for the first fire, showing every step and the authority for each.

Read the worked answer

Step 1 - gross loss on the basis of claim. Under the Reinstatement Value Clause the measure is the cost of reinstating the property to its pre-loss condition, not depreciated book value: ₹6.40 crore of damage plus ₹40 lakh of debris removal = ₹6.80 crore.

Step 2 - salvage. Scrap realisation of ₹25 lakh reduces the loss: ₹6.80 crore - ₹0.25 crore = ₹6.55 crore. The salvage belongs to the insurer and its sale must be documented, since the insurer is entitled to credit for it.

Step 3 - the averaging test. The Reinstatement Value Clause operates only if the sum insured is not less than the reinstatement cost at inception. The insurer's own valuer put that cost at ₹24 crore against a sum insured of ₹18 crore, so the insured is its own insurer for 25% of every loss. Claim = ₹6.55 crore × 18/24 = ₹4.9125 crore. The bank's valuation for loan purposes is irrelevant: it measures realisable security, not reinstatement cost, and cannot override the clause. If the clause had been breached altogether, the insurer could pay on market value instead, which is worse for the insured.

Step 4 - deductible. 5% of the claim is ₹24.56 lakh, which exceeds the ₹1 lakh minimum, so ₹24.56 lakh is deducted.

Amount payable: approximately ₹4.67 crore (₹4,66,68,750).

The insurer should confirm in the survey report that the insured intends to reinstate within the 12-month period; if it does not, payment reverts to an indemnity (market value) basis and the amount falls sharply.

2. How should the second fire of 14 February 2025 be handled, and what does the Reinstatement Value Clause require of the insured after a loss?

Read the worked answer

The sum insured is not restored automatically. Payment of the first claim does not reinstate the sum insured; unless the policy carries an express Restoration of Sum Insured add-on (normally limited to a stated number of restorations and a percentage of the sum insured), the ₹18 crore continues to be the limit for the whole policy period, and it is not reduced by the first payment either. The insured therefore remains insured for up to ₹18 crore aggregate, and the second loss is assessed against the same adequacy test: ₹1.10 crore × 18/24 = ₹82.50 lakh, less the 5% deductible of ₹4.125 lakh, giving approximately ₹78.38 lakh.

The reinstatement obligation. The Reinstatement Value Clause is a facility, not a free upgrade. The insured must actually reinstate the damaged property within 12 months of the loss - here by 18 November 2025 - and must permit the insurer's surveyor to inspect the reinstatement. If it does not rebuild, the claim is reworked on an indemnity basis and the difference recovered or set off. Where the property is reinstated in part, the clause applies proportionately.

Additional points the file must address. The second fire in an adjacent block within three months of the first will attract a fresh cause-of-loss investigation; if both fires share a cause (for example, hot work or electrical overload during repairs), the insurer should look at whether the repairs themselves were negligently managed. The underinsurance found at the first loss is a material fact for renewal: the insurer should require the sum insured to be re-fixed at the current reinstatement cost, charge the additional premium on the shortfall, and record the advice in writing so that a later dispute on adequacy cannot be laid at the insurer's door.

3. The insured disputes averaging on debris removal. Advise on how the clause should be read and what the insurer should communicate.

Read the worked answer

The answer turns on the wording of the debris removal provision actually attached to the policy, and the file must be read before any concession is made.

If debris removal is an add-on expressed as a percentage of the sum insured and stated to be 'within' the sum insured, the expenditure is part of the total loss and shares the same adequacy test. Averaging applies, and the insured's objection fails.

If the clause is drafted as an amount 'in addition to' the sum insured, subject to its own stated cap (commonly a small percentage of the sum insured), it is a separate limit, not a proportionate one, and averaging does not touch it, although the cap itself must be checked. The same logic governs the Architects, Surveyors and Consulting Engineers' Fees clause.

What the insurer should communicate. Rather than assert averaging, the insurer should write to the insured quoting the exact clause, showing the computation in a schedule (gross loss, salvage, adequacy ratio, deductible), and separating the debris removal figure so that the insured can see which treatment has been applied and why. Where the clause is ambiguous, standard contra proferentem reasoning applies and the reading favourable to the insured should be adopted - a dispute over ₹40 lakh is not worth an adverse ombudsman finding on the whole claim.

The broader point to convey is commercial: the ₹6 crore shortfall between the sum insured and the reinstatement cost is a board-level risk management issue, since the plant is only 75% insured for every future loss, and the insured should be advised to fix the sum insured at the current reinstatement cost at renewal and to consider a Declaration or Floater policy if stock values fluctuate.