A 30-room hotel beside Nakki Lake in Mount Abu expanded from 12 rooms in 2022 without informing the Rajasthan State Pollution Control Board. Its last consent to operate covers 12 rooms and expires next year. Sewage goes to a septic tank and soak pit about 25 m from the lake; in peak season a tanker empties the surplus into a seasonal nala that reaches the lake. A 125 kVA diesel generator runs six hours a day during outages, with no acoustic enclosure. The municipal council has issued a trade licence and collects a commercial water tariff; the hotel argues that it is a service, not an industry, so no pollution consent is needed, and that its expansion is a building-permission matter alone. Downstream residents complain of odour and grey water at the lake's bathing steps; a voluntary group has photographed the nala discharge.

1. Evaluate the hotel's legal argument that it requires no pollution consent. Which statutes and instruments actually apply, and what does the 12-room consent mean for the 18 extra rooms?

Read the worked answer

The 'service, not industry' argument fails at the first step.

  • The water pollution law requires prior consent for any establishment discharging sewage or effluent into a stream, well, land or sewer - the operative word is establishment, not factory. A hotel discharging septic overflow and tanker loads into a nala that reaches a lake falls squarely within it, and the consent to establish and consent to operate are the two instruments.
  • The air law covers industrial plants and emission sources; a 125 kVA diesel generator is an emission and noise source that is routinely regulated through consent conditions, including acoustic enclosure and stack height.
  • Hotels are listed in the central pollution control board's sector categorisation by size. Small units in the least polluting categories may use a self-declaration route - but self-declaration is a form of consent, not an exemption, and the categorisation depends on the declared size, sewage load and generator capacity. A 30-room lakeside hotel with a DG set and a tanker discharge is not the profile of a unit that simply informs and proceeds.

The 12-room consent. A consent is issued for a stated capacity. Once the hotel operates 30 rooms, the additional effluent, water draw and generator load are outside the consent, so the expansion is operation without valid consent for the added load - regardless of whether a building permission was obtained. Building permission and pollution consent are separate approvals addressing separate harms; one cannot substitute for the other.

Other instruments to check: the Solid Waste Management Rules, 2016 for septage handling (a tanker must discharge at an authorised point, not a nala); the Wetlands (Conservation and Management) Rules, 2017 if the lake is a notified wetland; and municipal trade-licence conditions, which can be revised.

Conclusion: the hotel needs an amended consent for 30 rooms plus generator conditions, and the soak pit 25 m from the lake is a design defect to be corrected, not argued about.

2. Set out the enforcement sequence the SPCB regional office should follow, with the interim measures it can justify before the full case is decided.

Read the worked answer

Sequence

  1. Inspection with a checklist: room count and occupancy, water consumption from the commercial tariff records, septic tank condition, soak pit distance and level, tanker log and discharge point, DG capacity and hours, acoustic enclosure, stack, noise measurement at the boundary.
  2. Sample the nala at the discharge point and 50 m downstream, and sample the lake near the bathing steps. Record flow, time, and photographs with date stamps; note the tanker's registration number and the operator's statement.
  3. Show-cause notice to the hotel stating the specific breaches: operation beyond consented capacity, discharge to a nala without consent, DG without acoustic enclosure.
  4. Personal hearing, minuted. This is the step that most often decides whether the order survives appeal.
  5. Directions: stop tanker discharge to the nala immediately; septage only to an authorised disposal facility; install an STP or connect to sewer within a stated time; acoustic enclosure and stack for the DG; apply for amendment of consent for 30 rooms with a bank guarantee for compliance.
  6. Escalation if ignored: closure directions for the unconsented expansion, and the complainants may approach the National Green Tribunal for inaction.

Interim measures justified now, before the full case

  • Stop the tanker discharge - it is the clearest, most reversible and most harmful act.
  • Require the DG to be enclosed or restricted to daytime hours in the interim, because noise at night is the immediate nuisance.
  • Ask the council to arrange septage collection, so the order is feasible rather than merely prohibitive.
  • Put the soak pit under observation and require a groundwater sample from a nearby handpump, since a lakeside soak pit is a contamination pathway.

Caution: enforcement built only on the photographs will be contested. The inspection record and the hotel's own water bills and tanker log are stronger evidence than an outsider's image, and the water tariff records are already in the council's hands.