Casting
Mould parts: cope (top), drag (bottom), parting line, sprue (vertical pouring passage), runner, gate, riser (feeds shrinkage), core (forms internal cavities), vent. Green sand is silica + clay + moisture. Pattern allowances: shrinkage (added, e.g. 10 mm/m for cast iron), draft (taper for easy withdrawal), machining (extra metal), distortion, rapping. Defects: blowhole, shrinkage cavity, hot tear, misrun, cold shut, sand inclusion.
Welding
Arc and gas welding are fusion processes. Soldering (below 450 °C) and brazing (above 450 °C) do not melt the parent metal. TIG uses a non-consumable tungsten electrode plus filler; MIG uses a consumable wire with shielding gas; resistance spot welding uses pressure and current with no filler. Defects: slag inclusion, porosity, undercut, lack of penetration, spatter.
Forming
Hot working means recrystallisation, lower forces and oxide scale; cold working gives strain hardening, a better finish and closer tolerance. Rolling, forging, extrusion, wire drawing and press work. In blanking the punched-out piece is the product; in piercing the hole is the product.
Worked example
A cast-iron block must finish 200 mm long; shrinkage allowance is 10 mm/m. Pattern length = 200 + (200 × 10/1000) = 200 + 2 = 202 mm. The allowance is added to the pattern, never to the finished casting.
Traps
- Applying shrinkage allowance to the finished casting instead of the pattern.
- Reversing blanking and piercing.
- Calling brazing a fusion process.
- Subtracting draft allowance instead of adding it.