Kwale Agro-Processing Ltd (KAP) sells crop-drying equipment with a standard 24-month service warranty bundled into the price. In FY2025 KAP signed 40 contracts at KES 1,200,000 each, total KES 48,000,000, and recognised the full amount as revenue on delivery because the equipment was shipped and invoiced. Standalone selling prices are KES 1,000,000 for the equipment and KES 400,000 for a 24-month service plan, but KAP has never sold the service separately. The finance director argues that because the service is never sold alone, no reliable allocation is possible and full recognition on delivery is defensible. The external auditor has flagged the treatment as a likely material misstatement. KAP's profit before tax is currently KES 9,600,000 against a KES 60,000,000 loan covenant requiring profit before tax of at least KES 8,000,000. Service costs are incurred evenly over 24 months.

1. Assess whether KAP's revenue recognition is acceptable and quantify the correction required at FY2025 year-end (assume 6 months of the 24-month service period have elapsed by year-end).

Read the worked answer

The treatment is not acceptable. The contract contains two distinct performance obligations: the equipment (a point-in-time obligation) and the 24-month service (an obligation satisfied over time). IFRS 15 requires allocation of the transaction price to each obligation on the basis of relative standalone selling prices, and where a price is not directly observable it must be estimated (e.g. expected cost plus a margin, or adjusted market assessment) - the absence of separate sales does not permit non-allocation.

Allocation using the stated standalone prices:

  • Total SSP = 1,000,000 + 400,000 = 1,400,000
  • Equipment share = 1,000,000 / 1,400,000 = 71.43% → 857,143 per contract
  • Service share = 400,000 / 1,400,000 = 28.57% → 342,857 per contract

For 40 contracts:

  • Equipment revenue recognised at delivery: 40 × 857,143 = KES 34,285,720
  • Service revenue for 6 of 24 months: 40 × 342,857 × 6/24 = KES 3,428,570
  • Total revenue correctly recognised = KES 37,714,290
  • Revenue overstated by 48,000,000 − 37,714,290 = KES 10,285,710

The deferred service revenue of 40 × 342,857 × 18/24 = KES 10,285,710 sits as a contract liability. Profit before tax falls by the same amount to roughly KES 9,600,000 − 10,285,710 = negative KES 685,710, breaching the KES 8,000,000 covenant. The auditor's position is correct; KAP must restate and disclose the covenant breach.

2. The finance director proposes recognising the full contract price on delivery but disclosing the service obligation as a contingent liability in the notes. Evaluate this proposal and explain the governance and audit implications.

Read the worked answer

The proposal is not acceptable. A contingent liability is a possible obligation whose existence depends on a future uncertain event, or a present obligation that cannot be reliably measured. KAP has a present obligation to provide 24 months of service under enforceable contract terms; it is neither possible nor uncertain, and it can be measured. The correct presentation is a contract liability (deferred revenue) under IFRS 15, not a contingent liability.

Disclosure cannot cure a recognition error. The financial statements would still overstate revenue and profit, misstate liabilities, and mislead users. The proposal effectively asks the auditor to accept a known misstatement in exchange for narrative disclosure, which the auditor cannot do if the effect is material.

Governance implications:

  1. The audit committee should treat this as a disagreement with management and require documentation of the rationale.
  2. If management insists, the auditor should consider a modified opinion (qualified for material misstatement) and report the matter to those charged with governance under ISA 260.
  3. The loan covenant breach triggers a disclosure obligation and may require the lender to be informed; concealing it through revenue timing raises integrity concerns relevant to the directors' duties.
  4. The board should review whether the finance director's position reflects pressure to meet the covenant, and consider whether a second opinion or restatement timetable is needed.

A defensible response is to correct the accounting, disclose the covenant breach, and negotiate a waiver with the lender.