A 450-bed private hospital in Mombasa was inspected after a complaint. The inspector recorded: two boxes of adrenaline 1 mg/mL injection that expired four months ago, still in the emergency crash trolley; nine days of missing refrigerator temperature logs, with the data logger showing vaccines held at 11-13 C for an unrecorded period; no written SOP for preparing paediatric parenteral nutrition; and three near-miss mix-ups between hydralazine 25 mg and hydroxyzine 25 mg, whose cartons look almost identical. Ward stocks are topped up by a pharmaceutical technologist, and one pharmacist covers 11 wards with no second check on discharge prescriptions. The hospital asks the inspector not to suspend the pharmacy licence and proposes to fix everything within 90 days.

1. Grade the findings and state which require action before the inspector leaves the premises. Justify the grading.

Read the worked answer

Grade on actual or imminent risk of patient harm and on whether the failure is a one-off or a system defect.

Critical (immediate risk): expired adrenaline in a resuscitation trolley - this is the drug used in cardiac arrest, and a four-month-expired ampoule is a direct failure of the emergency response; and the vaccines held at 11-13 C for an unknown period, because a cold chain breach may have already been followed by administration of ineffective vaccine to patients. Critical findings are those where a patient could be harmed before the next inspection.

Major (system failure likely to cause error): no SOP for paediatric parenteral nutrition, which is a high-risk compounded product with a narrow margin for calculation and contamination error; the unresolved look-alike pair with three near misses, where only luck prevented harm; the absence of any second check on discharge prescriptions; and a staffing level of one pharmacist for 11 wards.

Minor: documentation gaps that do not by themselves endanger patients.

Before leaving, the inspector should require: physical removal and segregated quarantine of the expired adrenaline with a written record; immediate quarantine of all refrigerator contents with the data logger downloaded and preserved; and a written instruction not to use the quarantined vaccines pending assessment.

2. Should the licence be suspended? Give your reasoning and the alternative you would impose.

Read the worked answer

Suspension should be proportionate, not automatic. The test is: is there a continuing risk that cannot be controlled short of closure, and is there a history or evidence of concealment?

Here the critical findings are correctable within hours - expired stock can be removed and the refrigerator contents quarantined - and there is no evidence yet of patient harm or of falsified records. Suspending the pharmacy would remove pharmaceutical services from 450 beds, including emergency and paediatric services, and could cause more harm than the deficiencies themselves. So suspension is not the right first response.

The appropriate response is a written compliance notice with a tiered timetable: immediate actions for the criticals, 14 days for the major items (SOP for paediatric parenteral nutrition, look-alike separation and double-check procedure, staffing cover plan), and no more than 90 days for the documentation items. Attach conditions to the licence - mandatory near-miss reporting and monthly temperature log submission - and schedule an unannounced re-inspection at 30 days.

The hospital's proposal to fix everything within 90 days must be rejected as a blanket timeline: 90 days is acceptable for records, not for a crash trolley holding expired adrenaline. Escalate to suspension if criticals recur at re-inspection, if the cold chain breach turns out to have been known and concealed, or if the hospital fails to identify and follow up the patients who received potentially compromised vaccine.

3. Design the corrective and preventive action plan and the measures you would use to test whether it worked.

Read the worked answer

Cold chain: repair or replace the refrigerator, fit a calibrated continuous logger with a high-temperature alarm and power-backup, and reinstate a twice-daily signed log with a named deputy. Identify every patient vaccinated during the unrecorded period, obtain the manufacturer's or EPI stability assessment for the actual excursion, and revoke and revaccinate where immunity cannot be assured. This is a clinical follow-up action, not just a documentation fix.

Emergency stock: monthly expiry check of every crash trolley against a signed checklist, with date-marked rotation and a named owner per trolley.

Look-alike products: separate shelving with tall-man lettering, warning stickers, and where possible switch one of the pair to a different pack or supplier; add an independent double-check at dispensing.

High-risk compounding: write and approve the paediatric parenteral nutrition SOP, train and competency-assess each operator, and require a second-person check of calculations.

Staffing: review pharmacist cover against ward activity; a single pharmacist for 11 wards with no discharge check is a resourcing decision that the hospital management, not the pharmacy, must fund.

Effectiveness measures (assessed over three months): zero expired items on unannounced trolley audits, 100 percent log completion with no unrecorded excursion, a measurable rise in reported near misses (a rise is a good sign - it means reporting is working), and zero calculation errors in a sample audit of 50 paediatric parenteral nutrition preparations. If these are not met, escalate the licence conditions.