Containment Pressure Loss, Decontamination Breach, and Waste Staging at a Hospital

KY Asbestos Abatement · Put your knowledge to work in context.

All case studies

Containment Pressure Loss, Decontamination Breach, and Waste Staging at a Hospital

At a hospital, a three-person crew is removing 800 square feet of 9-inch by 9-inch vinyl asbestos floor tile and black mastic from a corridor. The containment has polyethylene walls and floor, a HEPA negative-air unit, and a three-stage decontamination unit. At 10:30 the magnehelic gauge reads -0.005 in. w.c., down from -0.02, and the HEPA unit's alarm is chirping. A worker leaves the work area without showering; visible dust is tracked across the clean room and into the corridor. The crew has 30 rolls of 6-mil bags but no rigid waste drum. The infection-control nurse wants the corridor reopened by 14:00 for patient transport. The supervisor says the pressure drop is minor and proposes to finish the last 100 square feet before repairing the unit. No air monitoring has been done during the project, and the waste bags are being stored beside the clean room.

1. What is the immediate stop-work and emergency response, and why is the supervisor's proposal unacceptable?

Read the worked answer

Stop work immediately. A pressure drop from -0.02 to -0.005 in. w.c. plus a HEPA alarm means containment is not reliably negative and the unit may be failing; continuing the last 100 square feet would generate dust while contaminated air may migrate into the hospital. Shut down dust-generating tools, avoid dry sweeping, keep patients and staff out, and notify the supervisor, infection control, and project owner. Seal the opening, repair or replace the HEPA unit, check filters and ducting, and do not restart until negative pressure is reestablished and verified with a smoke test or manometer. Treat the corridor as potentially contaminated: HEPA-vacuum and wet-wipe the clean room and corridor, replace tacky mats, and expand the regulated area as needed. Reopening at 14:00 is not justified until cleanup and, where required, clearance are complete.

2. Identify the decontamination failures and describe the correct sequence for the worker and the contaminated clean room.

Read the worked answer

The worker skipped the shower and crossed the clean room in contaminated clothing, tracking dust into the corridor. He should re-enter the dirty room, HEPA-vacuum his coveralls while still in the work area, remove them in the dirty room, and shower before putting on clean clothes. The clean room is now contaminated: HEPA-vacuum and wet-wipe all surfaces, including floors, benches, and door handles; replace tacky mats; and bag the used cleaning materials as asbestos waste. The decontamination unit should have a dirty room, shower, and clean room with proper airflow from clean to dirty. No eating, drinking, or smoking in the unit. The supervisor should document the breach and retrain the crew on exit procedures before work resumes. The hospital's infection-control staff should be involved in corridor cleanup because patient transport areas are affected.

3. How should the waste be packaged, labeled, stored, and transported, and what is wrong with the current staging?

Read the worked answer

The waste should be wet, placed in leak-tight 6-mil bags, double-bagged using a gooseneck closure, and labeled as asbestos waste with the generator's name and location. If bags could be punctured, place them in a rigid, leak-tight drum. Store waste in a locked, labeled area away from the clean room, patient corridors, and air intakes; the current staging beside the clean room is unacceptable because it can recontaminate clean areas. Do not use a shop vacuum or dry broom. Transport only with a licensed hauler to a permitted landfill, and keep waste shipment records. NESHAP requires no visible emissions during handling and transport. Asbestos waste is not automatically a RCRA hazardous waste, but it remains a regulated solid waste and must meet state and local disposal requirements. The hospital's normal waste stream must not be mixed with asbestos waste.