Custom Ovens, Oral Modification, and a Lost Catering Contract

LEAB · Put your knowledge to work in context.

All case studies

Custom Ovens, Oral Modification, and a Lost Catering Contract

Northwind Kitchenworks signed a purchase order with Forge & Flame for 12 custom convection ovens at $9,500 each, delivery by March 15, ahead of an April 1 opening. The ovens were to be specially manufactured with Northwind's logo. The signed form includes a merger clause, a 10-day written-notice requirement for delay claims, a consequential-damages exclusion, and a force majeure clause that lists floods and strikes but not supplier steel shortages. In February, Northwind's operations manager orally agreed to accept April 5 delivery and to pay a $2,000 expedite fee. Forge delivered on April 6; three ovens failed calibration. Northwind lost a $40,000 catering contract. Forge cites a steel shortage and the oral modification; Northwind invokes the written-notice and merger clauses. Assume UCC Article 2 governs and the parties are merchants.

1. Did the February oral agreement modify the purchase order, and can Forge enforce the $2,000 expedite fee? Explain the effect of the merger clause and any no-oral-modification term.

Read the worked answer

Under UCC 2-209(1), a modification needs no consideration, so the $2,000 expedite fee is not invalid simply for lack of consideration. A merger clause recites that the writing is final, but it does not by itself prevent a later modification; it mainly affects evidence of prior or contemporaneous terms. If the purchase order contains a no-oral-modification clause, UCC 2-209(2) makes that clause effective, but 2-209(4)-(5) allow waiver or estoppel when a party relies on the oral change. Northwind's operations manager likely had apparent authority to agree to the delivery date and expedite fee, and Forge's reliance-shipping and incurring expedite costs-supports waiver. The modified deal is still within the statute of frauds and is evidenced by the signed original plus part performance. A court would likely enforce the oral modification as a waiver unless Northwind proves the manager lacked authority or the contract expressly bars both modification and waiver. The safer exam answer is 'likely enforceable but jurisdiction-sensitive.'

2. Can Northwind recover the $40,000 lost catering contract despite the consequential-damages exclusion and the 10-day notice clause?

Read the worked answer

UCC 2-719 permits parties to exclude consequential damages unless the exclusion is unconscionable. Between merchants buying custom commercial ovens, the exclusion is generally enforceable, so the $40,000 lost catering profit is likely barred as consequential damages. The 10-day written-notice clause is a contractual condition for delay claims; failure to give notice can bar the claim if the clause is enforced. Northwind can argue waiver: Forge orally agreed to April 5 and then delivered late, and Northwind accepted the goods. Notice for defective goods is separate under UCC 2-607(3): Northwind must notify Forge within a reasonable time after discovering the calibration failure or be barred from a remedy. The strongest claim is direct damages for the three defective ovens-repair, replacement, or cover-plus incidental costs, not the catering contract. If Forge knew about the April 1 opening and the delay was substantial, Northwind may also argue that enforcing the notice clause would deprive it of an essential remedy, but that argument is weaker between sophisticated merchants.

3. Does the steel shortage excuse Forge's delay, and what are Northwind's remedies for the three defective ovens?

Read the worked answer

UCC 2-615 excuses delay only if performance is impracticable because of an occurrence whose nonoccurrence was a basic assumption, and the seller must notify the buyer. A steel shortage is often a foreseeable manufacturing risk and is not listed in the force majeure clause. Forge bears the burden to show it could not reasonably have obtained substitute steel or allocated production fairly. The clause's list is not necessarily exclusive, but a court will read it against the drafter and may treat the shortage as an ordinary business risk. Even if excused, Forge must show it gave timely notice. For the three defective ovens, Northwind can reject if the defect substantially impairs value, or accept and recover damages under UCC 2-714. It must give timely notice. Remedies include repair or replacement, cover, incidental damages, and possibly direct lost profits if proved with reasonable certainty, but not the excluded consequential catering loss. Northwind should preserve evidence and inspect the other nine ovens before accepting them.