Floodplain Fringe and a Rain Garden That Cannot Fit
A 0.22-acre infill parcel (9,583 sq ft) sits four blocks from a bus route inside the city's designated priority-growth area. The site operated as a filling station from 1955 to 1988; the state issued a no-further-action letter for the upland portion after soil remediation, but the rear 0.09 acre lies in FEMA Zone AE with a base flood elevation of 812 ft. The team proposes a 2,100 sq ft two-story house, a 400 sq ft attached garage, a full basement, and a 900 sq ft concrete driveway. Local code requires the lowest floor at BFE plus 1 ft. Post-construction impervious cover is 85%, and the local 90th-percentile 24-hour rainfall is 3.1 in. The civil engineer's stormwater plan is a single rain garden sized for 12 in of ponding with a 30% void ratio. The developer asks whether the floodplain kills the location points and whether the rain garden plan is adequate.
1. Does the rear floodplain portion disqualify the project from site and location credits? What design changes would protect the claim?
Read the worked answer
Not automatically - but the current design probably does.
How the credits actually look at the site Site-selection screening is applied to the development footprint: the building, garage, driveway, and other permanent hardscape. The test is where you build, not whether the parcel boundary touches a floodplain. So the first deliverable is a scaled footprint drawing over the FIRM panel, with the 812 ft BFE contour drawn on it.
Where this scheme fails
- The full basement is the killer. A basement is the lowest floor, so the code requirement forces it to 813 ft. In Zone AE that is effectively unbuildable, and it drives flood insurance and lender scrutiny even if the credit language could be argued.
- A 900 sq ft driveway plus garage push hardscape toward the rear of a shallow lot. If any of that lands in the 0.09-acre floodplain portion, the credit is lost.
Changes that protect the claim, in priority order
- Delete the basement. It buys floor area the project cannot insure, and it complicates both the floodplain credit and the durability story.
- Pull the house, garage, and driveway onto the 0.13-acre upland area, with the garage forward of the house rather than behind it.
- Shrink the driveway and use permeable surfacing so the hardscape both fits and reduces runoff.
Two cautions The construction-activity-pollution-prevention prerequisite applies regardless of whether the site credit is earned: erosion and sediment control, stabilized entry, and stockpile management for any residual contaminated soil. And verify the exact wording of the current site credit, since specific constraints such as wetlands or prime farmland are sometimes assessed across a wider area than the footprint. Designing to the stricter reading is cheap; discovering it after the foundation is poured is not.
2. Check the rain garden sizing. Does the engineer's plan actually manage the 90th-percentile storm, and if not, what combination of measures would?
Read the worked answer
The arithmetic shows the plan is not close
Impervious area after construction: 0.85 × 9,583 = 8,146 sq ft. Runoff volume from 3.1 in of rain: 8,146 × (3.1 / 12) = 2,104 cu ft. Storage per square foot of rain garden: 1 ft of ponding × 0.30 void ratio = 0.30 cu ft per sq ft. Required garden area: 2,104 / 0.30 = 7,014 sq ft.
That is about 73% of a 9,583 sq ft lot, before accounting for the floodplain at the rear and the setbacks around a house. The single rain garden as drawn is infeasible, and 12 in of ponding is deeper than a residential rain garden should be anyway.
A workable package Cut impervious cover from 85% to 65% by shrinking the driveway and using permeable pavers: 9,583 × 0.65 = 6,229 sq ft, generating 6,229 × (3.1 / 12) = 1,609 cu ft.
- Roof runoff to a 2,500-gallon cistern: 2,500 / 7.48 = 334 cu ft.
- A 1,200 sq ft rain garden at 9 in (0.75 ft) ponding and 0.30 void: 1,200 × 0.75 × 0.30 = 270 cu ft.
- Infiltration during a 24-hour storm at 0.5 in/hr in amended soil: 1,200 × (0.5 / 12) × 24 = 1,200 cu ft.
Total managed: 334 + 270 + 1,200 = 1,804 cu ft against a 1,609 cu ft target, with margin.
The judgement to convey Storage-only sizing is what produced the impossible number. Infiltration credit during the storm, imperviousness reduction, and roof capture do the real work. Confirm the local design storm definition and the credit's treatment of infiltration before the site plan is sealed - and keep the garden out of the floodplain fringe, where it would be both ineffective and a permitting problem.
3. The bus stop is four blocks away on paper, but the direct walking route crosses a drainage culvert with no sidewalk, making the actual walk 0.45 mile. How should the team handle the transit credit?
Read the worked answer
Measure the walk, not the map Location credits measure pedestrian distance along a safe, direct, accessible route - sidewalks, marked crossings, and usable paths. A line drawn across a culvert is not a route. If the honest measurement is 0.45 mile, the project likely exceeds the walk-distance threshold for bus service in that credit, and the point should be treated as lost until the route changes.
Options, in order of cost
- Build the connection. A sidewalk segment and handrail across or around the culvert may be a condition of the local jurisdiction anyway. Get a cost and an easement position before dismissing it; a $40,000–60,000 path is only rational if it is the cheapest available point and serves the whole block.
- Document a different route. Re-walk the area looking for an existing signalized crossing. Sometimes an extra 200 ft with a light is still inside the threshold, and the first assessment simply missed it.
- Accept the loss and shift effort. The site already sits in the designated priority-growth area, and that preferred-location credit is independent of the culvert. Take that point, drop the transit point, and spend the difference on Water or Energy credits where the cost per point is lower.
What not to do Do not claim the straight-line distance, and do not count a route through a private parking lot that could be gated later. Verifiers check routes on site, and a disallowed point discovered at final review costs the project its certification level with no time left to recover.
Broader lesson Location points are fixed by the parcel's context. Unlike Energy or Water, you cannot engineer your way to them after the site is chosen. When a location point is expensive or lost, rebalance the scorecard early, while design changes are still free, rather than chasing it after framing.