ME Electrician: Grounding, bonding, overcurrent protection, and safety

ME Electrician · Work through your exam, one topic at a time.

All guide sections

Grounding, bonding, overcurrent protection, and safety

What this domain tests

This domain tests Article 250 grounding and bonding, Article 240 overcurrent protection, and the safety rules that keep fault current on a low-impedance path. Questions ask you to distinguish the grounded conductor from the equipment grounding conductor, size grounding and bonding conductors, select overcurrent devices, and apply working-space and PPE rules.

Core rules

  • The service neutral is bonded to the equipment grounding conductor at the service disconnecting means through the main bonding jumper. Downstream panels are not bonded again; a separate derived system is bonded at its source.
  • Grounding electrode conductors are sized from Table 250.66 using the largest service-entrance conductor. Equipment grounding conductors are sized from Table 250.122 using the overcurrent device rating.
  • All grounding electrodes present must be bonded together per 250.50; a supplemental electrode may be required.
  • Overcurrent devices must have adequate interrupting rating (110.9, 240.85), and series ratings are permitted only where listed. Standard ratings are in 240.6; small-conductor limits are in 240.4(D).
  • Safety: 110.26 working space, lockout/tagout, test before touch, and appropriate arc-rated PPE.

Worked example

A service has 2/0 copper service-entrance conductors. Table 250.66 requires a 4 AWG copper grounding electrode conductor. Reasoning: the GEC is sized from the service conductors, not from the load calculation; 2/0 copper falls in the 1/0-2/0 row, which specifies 4 AWG copper. Using the equipment grounding conductor table instead would be the wrong table.

Traps

Bonding neutral and ground again at a subpanel; using the neutral as an equipment grounding conductor; sizing the GEC from load; ignoring interrupting rating; applying the next-size-up rule without meeting 240.4 conditions.