Peri-urban Ninghe District (300 km²) has lost 18% of its farmland since 2015 while population grew 32%. Three logistics parks opened, the water table fell 6.5 m, and the last 500 ha of a protected wetland lie 800 m from a proposed 600 ha solar farm. The solar project would generate 80 MW, use 20-year leases and cut agricultural water use by 15% on the leased land. The grid connection is limited to 60 MW. Regional policy requires no net loss of prime farmland and a 500 m buffer around the wetland. Farmers are divided: 60% of surveyed households favour leases because grain prices are low; 40% fear loss of land and jobs. The district must decide within six months.
1. Evaluate the solar project against energy, food-security, water and wetland criteria. Identify which claimed benefits do not survive scrutiny.
Read the worked answer
Energy: the project would generate 80 MW, but the grid can accept only 60 MW, so 20 MW would be curtailed or need storage. The benefit should be assessed at 60 MW unless storage is funded.
Food security: 600 ha is 2% of the district, but it is prime farmland and regional policy requires no net loss. The lease does not by itself meet that rule; an offset of equal productivity is needed. The claim that solar 'saves' farmland because it uses less water is weak: it removes the land from food production for 20 years.
Water: a 15% cut in agricultural water use on the leased land is real, but the water table fell 6.5 m and the logistics parks are likely abstraction users. The project does not address the main driver.
Wetland: 800 m exceeds the 500 m buffer, so it is compliant on distance, but construction runoff and changed hydrology still need assessment.
The claimed benefits that do not survive scrutiny are the full 80 MW and the idea that water savings offset farmland loss. The farmers' 60% support is evidence of low grain returns, not proof of sustainability.
2. Recommend a decision with conditions. Explain how you would address the 40% of farmers who oppose the project.
Read the worked answer
I would give conditional approval at 60 MW, not 80 MW, because the grid constraint makes the larger figure undeliverable. Conditions:
- Lease only degraded or fallow land first, with agrivoltaics on at least 30% of the area so some agricultural production continues.
- Require a farmland offset of equal productivity, independently verified, to meet the no-net-loss rule.
- Fund a wetland hydrological assessment before construction and monitor water levels for five years.
- Give leaseholders a renewal and exit clause, and priority for construction and maintenance jobs.
For the 40% who oppose, the issue is likely loss of land and jobs, not only compensation. I would offer a share of lease revenue to a village fund, a right of first refusal on leases, and a retraining programme. If the food-security target is legally binding, I would reduce the project to 300 ha rather than override the policy. The decision should be reviewed after 10 years against groundwater and farmland indicators.
3. Discuss the scale at which this decision should be assessed. Which indicators would you use, and why might a district-level assessment hide important effects?
Read the worked answer
The decision should be assessed at three scales. At the district scale, indicators are prime farmland lost, MW delivered, groundwater level and wetland water level. At the village scale, indicators are jobs, lease income, tenancy changes and access to common land. At the plot scale, indicators are soil quality, runoff and the viability of agrivoltaics.
A district-level assessment can hide effects because it aggregates 600 ha into a 300 km² total and makes a 2% loss look small. It can also miss that the leased land is concentrated in two villages, where the loss may be 20% of local farmland. Groundwater is another example: a district average may stabilise while one village's wells fail.
I would use a dashboard with district, village and plot indicators, and report the distribution, not just the mean. The six-month deadline is tight, but a village-level screening can be done quickly using existing cadastral and well records.