PSAC study materials
PSAC study resources

Greenway Fence Line Breaches at a Peak-Season Logistics Hub

PSAC · Put your knowledge to work in context.

All case studies

Greenway Fence Line Breaches at a Peak-Season Logistics Hub

A 22-acre logistics hub handles 1,100 trailer movements per month through one main gate and two employee entrances. The north perimeter runs 480 m alongside a public greenway with a footpath; in the last 90 days there were six confirmed fence-line breaches, all after 22:00, with cut mesh and no entry into the building. Lighting on that line measures 0.3 footcandles; the site standard is 0.5. A single unarmed guard covers the gate, CCTV (14 analog cameras), and roving patrol. Trailer yard parking is unassigned and often at 95% capacity. Management has approved $250,000 for security this year and wants a plan before the peak season in 10 weeks. Local police report a 20% rise in metal theft in the district, and the insurer has added a $25,000 deductible for theft claims. The site has no formal security risk assessment; the last CPTED review was five years ago.

1. How should you structure the assessment and sequence work before peak season?

Read the worked answer

Start by defining what must be protected: trailers, cargo, the building, and people, in that order for this threat. Then assess threat, vulnerability, and consequence separately. The six after-22:00 cuts are the threat evidence; the 0.3-footcandle lighting, greenway adjacency, unassigned yard parking, and single guard are vulnerability evidence; the consequence is cargo loss, insurance deductible, and peak-season disruption. Do not begin with a camera purchase, because the breaches are at the fence and the cameras may not be the root cause.

Sequence the 10 weeks as follows. Weeks 1–2: walk the north line at night, measure lighting at intervals, map vegetation and concealment, review police crime data, interview the guard about patrol coverage, and document the missing risk assessment as a finding. Weeks 3–4: design a layered perimeter package and obtain quotes; confirm the insurer's expectations. Weeks 5–8: install fence hardening, lighting, and vegetation clearing, and test the result at night. Week 9: commission and measure. Week 10: train staff and finalize the assessment report. Use a CPTED lens-natural surveillance, access control, maintenance, and territorial reinforcement-because the public greenway is a permanent adjacency, not a temporary condition.

2. Recommend a $250,000 portfolio and defend the trade-offs, including what you would defer.

Read the worked answer

Allocate roughly $90,000 to harden the 480 m north fence with anti-climb mesh, a topped section, and tamper-resistant fasteners; $45,000 to bring the line to at least 0.5 footcandles with LED fixtures and controls; $20,000 to clear vegetation and maintain a clear zone; $55,000 for gate and yard redesign plus license-plate capture at the main gate; $30,000 for video analytics on the north line tied to the guard station; and $10,000 for assessment, testing, and training. That totals $250,000. Defer full replacement of the 14 analog cameras and a second full-time guard, because the evidence points to a perimeter and after-hours problem, not a lobby problem. A second guard would cost well over $100,000 per year and would not fix a 480 m fence line.

Defend the trade-offs with the six confirmed cuts, the lighting gap, and the insurer's $25,000 deductible. Fence hardening and lighting change the attacker's effort and risk, while cameras mostly record after the fact. Keep a small contingency by phasing the analytics if quotes exceed estimates. If the budget is cut, protect the fence and lighting first; defer the label capture, not the physical barrier. State explicitly that the assessment is probabilistic and that six events in 90 days is a small sample.

3. What indicators would you track to show the plan is reducing risk rather than just adding equipment?

Read the worked answer

Track outcomes and leading indicators together. Outcome measures: confirmed fence breaches per 90 days, attempted-cut discoveries, theft claims and deductible payments, and trailer seal shortages. Leading measures: nighttime lighting readings at fixed points against the 0.5-footcandle standard, percentage of the north line with a clear zone, patrol scan completion after 22:00, alarm-to-guard-response time, and percentage of analytics alarms with a documented disposition. Also track yard occupancy and whether trailers are parked in assigned rows, because 95% capacity and unassigned parking create concealment and movement problems.

Set baselines before installation and review monthly for the first quarter, then quarterly. A drop in breaches with a simultaneous increase in attempted cuts may mean deterrence is working rather than that nothing is happening. If lighting improves but breaches continue, revisit patrol routes and gate procedures. Report the indicators to management and the insurer in plain language, and tie them to the original six-event baseline. Avoid claiming success from camera count or guard hours alone; those are inputs, not risk reduction.