Pick and Carry vs. the Static Chart

NCCCO LBC · Put your knowledge to work in context.

All case studies

Pick and Carry vs. the Static Chart

A 150-ton crawler with 90 ft of boom (roughly 310,000 lb operating weight) must pick a 16,000 lb generator from a truck at 30 ft radius and walk it 140 ft to a pad; rigging is 600 lb. The static chart shows 28,000 lb at 30 ft. The travel chart - boom in line with the tracks, level firm ground - shows 18,000 lb at 30 ft for pick-and-carry. The route crosses a 6 in. concrete slab with a 2 in. step at a construction joint, then 60 ft of compacted gravel. The operator plans to pick, swing 90 degrees so the load rides over the side, and carry it 8 ft off the ground so the spotter can see underneath.

1. Which chart governs, and is 16,600 lb acceptable on this route?

Read the worked answer

The travel chart governs - 28,000 lb is irrelevant once the crane moves with the load.

  • Gross load = 16,000 + 600 = 16,600 lb against 18,000 lb. That is 92% of chart with a 1,400 lb margin - and the route is not 'level firm ground.'
  • Two chart notes are already being violated by the plan:
    • Boom in line with the tracks: swinging the load 90 degrees to carry it over the side is outside the travel chart's basis and puts the load's moment across the crawler's weak axis.
    • Level firm ground: a 2 in. step at a slab joint is an impact. Dropping a track over a step can momentarily multiply the load on the boom and on the ground, and 92% leaves no room for it.

Better plan: reposition the truck so the carry radius is shorter (a few feet of radius buys thousands of pounds on a travel chart); keep the boom in line with the travel direction; carry the load as low as practical - roughly 2-3 ft of ground clearance, not 8 ft, since height adds overturning moment and blocks the operator's view; never travel and swing simultaneously; ramp or plate the joint so there is no step. If the margin cannot be improved, break the move down or use a larger crane.

2. Check the ground under the route and state what has to be done before the walk.

Read the worked answer

Ground bearing during travel:

  • 310,000 + 16,600 = 326,600 lb over 144 sq ft of track = ~2,270 psf (~16 psi) average - and travel is not even: weight shifts fore and aft as the crane rocks, and the step at the joint concentrates load on a short length of track.
  • A 6 in. unreinforced slab is unlikely to take that without cracking, and a cracked slab edge can punch up under a shoe. Get the slab checked, or mat/plate the crossing.

Route survey before the walk:

  1. Walk the entire 140 ft on foot - look for soft spots, patch repairs, trench backfill, vaults, basement walls, culverts, and any underground void. Surface appearance proves nothing.
  2. Verify compaction or bearing capacity along the gravel section, not just at the setup point.
  3. Remove or ramp the 2 in. step; verify the cross-slope and grade everywhere on the route against the manual's travel limits.
  4. Confirm no overhead obstructions or power lines along the path.
  5. Clear the route of personnel; assign a spotter ahead of the crane with a clear stop signal; keep everyone out of the track path and out from under the load.

3. Who directs the move, and what communication has to be in place?

Read the worked answer
  • A designated signal person/spotter walks ahead of the load-side track, in the operator's line of sight, and directs the travel. If the operator loses sight of that person, the crane stops - travel is not continued on assumption.
  • The signal person is not also rigging or handling the load; their only job is directing the move and watching the route and clearances.
  • Agreed, standard hand signals plus a radio; a horn signal to stop; everyone briefed before the move on the route, the stop point, and where they may not stand.
  • No one under the load, on the load, or between the load and a fixed object to 'steady' it. Taglines only, from outside the swing/fall zone.
  • The operator stops and resets if anything changes - ground condition, wind, visibility, or the load starting to swing.
  • Brief emergency plan: where the load is set down if the move has to be aborted, and who makes that call.