NM Land Surveyor: Topographic, Construction, and Engineering Surveys

NM Land Surveyor · Work through your exam, one topic at a time.

All guide sections

Topographic, Construction, and Engineering Surveys

What this domain tests

Questions cover mapping surface geometry, setting stakes that contractors can build from, and computing quantities and grades.

Core rules

  • Contours are interpolated between spot elevations; breaklines control where interpolation is valid. Label index contours and state the contour interval on the drawing.
  • Cut = existing ground minus proposed grade; fill = proposed minus existing. Sign conventions must be stated on the stake.
  • Slope stakes locate the catch point where the design template meets existing ground; the offset and grade difference define the intercept.
  • Volumes from average end areas: V = (A1 + A2)/2 × L. Convert cubic yards by dividing cubic feet by 27.
  • ALTA/NSPS surveys follow the current Table A requirements; the certification and the items checked are part of the deliverable.

Worked example

Two cross sections 100 ft apart have areas of 120 sq ft and 80 sq ft. Volume = (120 + 80)/2 × 100 = 10,000 cu ft; 10,000/27 = 370.37 cu yd. At a stake where existing ground is 104.20 ft and proposed grade is 100.00 ft, the cut is 4.20 ft. Reasoning: subtract in the right order and state the convention; a reversed subtraction produces a fill that will be built wrong.

Traps that cost marks

  • Using slope distance where horizontal distance is required.
  • Confusing cut and fill signs on stakes.
  • Ignoring shrinkage, compaction, or topsoil stripping in volume computations.
  • Mixing site datum with NAVD88 elevations.
  • Drawing smooth contours across a breakline.