Murmester study materials
Murmester study resources

Murmester: Machinery, Electrical Systems, and Propulsion

Murmester · Work through your exam, one topic at a time.

All guide sections

Machinery, Electrical Systems, and Propulsion

Domain 4 covers the propulsion train and the electrical services that keep the ship controllable and safe - the systems an engineer is expected to specify, monitor and test.

Propulsion configurations

  • Slow-speed two-stroke crosshead engines driving fixed-pitch propellers directly (around 100 rpm), the bulk-carrier and tanker norm.
  • Medium-speed four-stroke engines through reduction gearing, common in ferries and offshore units.
  • Diesel-electric and pod drives for redundancy and manoeuvrability.
  • Dual-fuel and gas-fuelled installations under the IGF Code, with bunkering and emergency shutdown arrangements.

Steering and electrical essentials

SOLAS II-1 Reg 29 requires main and auxiliary steering gear, two independent power units, transfer within 45 s, and a change from 35° on one side to 30° on the other in 28 s; emergency steering drills every three months. The emergency generator must start and connect automatically within 45 s, with capacity for 18 h on cargo ships and 36 h on passenger ships.

Worked example

A main engine of 9,000 kW MCR runs at 90% of rated rpm. By the propeller law P ∝ n³, absorbed power ≈ 9,000 × 0.9³ ≈ 6,560 kW - a 27% reduction for a 10% rpm cut. Note that the continuous service rating is a separate, lower figure than MCR and must not be quoted as the same number.

Traps

  • Confusing MCR with the continuous service rating.
  • Forgetting that auxiliary steering gear needs periodic testing and that drills are recorded.
  • Assuming a controllable-pitch propeller delivers full torque at any rpm.
  • Overlooking hazardous-area classification (IEC 60092-502) around fuel and cargo systems.