Nutanix NCA study materials
Nutanix NCA study resources

Nutanix NCA: Lifecycle and Upgrade Management

Nutanix NCA · Work through your exam, one topic at a time.

All guide sections

Lifecycle and Upgrade Management

The workflow

LCM (Lifecycle Manager) is the upgrade engine inside Prism. Its workflow is: run inventory (LCM discovers current software and firmware versions), review available updates and compatibility, then apply. LCM handles AOS, AHV, Prism Central, and - on supported hardware - firmware bundles. In environments without internet access, LCM uses a dark site bundle repository instead of Nutanix's online repository.

Upgrade characteristics worth memorising:

  • AOS upgrades are rolling and non-disruptive: CVMs are upgraded one at a time while VMs keep running.
  • AHV upgrades place hosts into maintenance one at a time, live-migrating VMs away first.
  • NCC checks and free capacity are prerequisites; upgrades need room for snapshots and rebuild activity.
  • Upgrade paths matter: some versions require an intermediate hop rather than a direct jump, so always check the compatibility and upgrade-path documentation.
  • Foundation is the separate tool for imaging bare-metal nodes and initial cluster creation.

Traps

  • Confusing LCM with NCC or with Foundation. LCM = updates, NCC = diagnostics, Foundation = imaging.
  • Assuming a one-click upgrade works with no internet and no dark-site configured.
  • Skipping prerequisites: critical alerts, insufficient free space, or failed NCC checks will block or jeopardise an upgrade.
  • Believing you can jump arbitrarily between AOS versions.

Rule of thumb

Upgrade order: confirm compatibility → run NCC and clear critical alerts → verify free space → take a Prism Central backup/snapshot → upgrade Prism Central first, then the clusters it manages, then firmware as advised.