Nutanix NCP-CI-Azure study materials
Nutanix NCP-CI-Azure study resources

Nutanix NCP-CI-Azure: Nutanix and Azure Hybrid Cloud Operations and Management

Nutanix NCP-CI-Azure · Work through your exam, one topic at a time.

All guide sections

Nutanix and Azure Hybrid Cloud Operations and Management

Domain 3: Hybrid cloud operations and management

This domain tests day-2 operation of NC2 clusters alongside on-premises Nutanix, with clear boundaries between the NC2 console, Prism, and Azure.

Management planes

  • The NC2 console is for infrastructure lifecycle: create, scale, and delete clusters; it is not the place to create guest VMs.
  • Prism Element manages the local cluster; Prism Central provides multi-cluster inventory, RBAC, categories, and centralized alerts. A PC can manage NC2 and on-prem clusters if network connectivity and version compatibility allow.
  • Azure portal/resource group management covers the underlying bare-metal nodes, NSGs, and networking.

Routine operations

  • Scale out by adding nodes through NC2, then confirm AOS rebalancing and RF compliance. Scale in only after data has drained and capacity/RF remain healthy.
  • Upgrade AOS/PC through Prism with compatibility checks; treat the Azure infrastructure as fixed during Nutanix software upgrades.
  • Monitor with Prism alerts and metrics; use Azure Monitor for VNet/NSG and infrastructure signals. Automate with Prism APIs and Azure CLI, not manual portal clicks.

Worked example

A three-node NC2 cluster needs more capacity. Add a fourth node via NC2; wait for the node to be discovered and AOS to rebalance; verify RF2 can tolerate one failure and that the storage runway improved. Do not add a node by creating an Azure VM-the node must be a certified bare-metal instance.

Traps

Using the Azure portal to upgrade AOS; assuming the NC2 console manages guest VMs; scaling in without draining; breaking Prism Central connectivity to a registered cluster; ignoring version compatibility between PC and PE.