Eight-Day Start on a Tulsa Office Renovation

OK Asbestos Abatement · Put your knowledge to work in context.

All case studies

Eight-Day Start on a Tulsa Office Renovation

A general contractor wins a renovation of a 1968 Tulsa office building. The scope includes removing 1,200 square feet of 2x4 acoustic ceiling tile and 180 linear feet of pipe elbow insulation. Both materials are assumed to be asbestos-containing until sampling is complete. The owner wants crews to start in 8 calendar days because tenants vacate on Friday. The contractor holds an Oklahoma asbestos abatement license, but three assigned workers have certificates that expired last year. The firm plans to have its own employees scrape the tile into open carts, carry it through a public corridor, and place it in the building dumpster. No notification has been filed with Oklahoma DEQ. The contractor says the job is small and NESHAP does not apply because the tile is not pipe insulation. The building has four floors and is occupied until Friday.

1. Determine whether NESHAP applies and identify the notification timing problem.

Read the worked answer

NESHAP applies. The renovation will disturb 1,200 square feet of ceiling tile, which is far above the 160-square-foot, 260-linear-foot, or 35-cubic-foot threshold for RACM in a facility renovation, assuming the tile is ACM. The pipe insulation is also regulated if ACM. The contractor's claim that NESHAP does not apply because the tile is not pipe insulation is wrong. The notice must be delivered or postmarked at least 10 working days before the start of asbestos stripping or removal. Eight calendar days, including a weekend, does not meet that. The owner must either delay the start or adjust the schedule; this is not an emergency renovation unless a sudden, unexpected event caused a safety or health emergency and the required procedures are followed. Starting without notice is a violation even if the job is small.

2. Identify the Oklahoma DEQ licensing and certification issues and the work practice violations.

Read the worked answer

Oklahoma DEQ asbestos rules require the abatement contractor to be licensed and workers to hold current certification or training; three expired certificates are not acceptable. The work practices are also deficient: no containment, open carts through a public corridor, dry scraping, and disposal in the building dumpster. Ceiling tile removal must use wet methods, HEPA vacuuming, negative pressure containment where required, decontamination, and proper waste packaging. The public corridor cannot be used as a waste route without protection and cleaning. The contractor should not start until licensing, notification, containment, and worker protection are corrected.

3. What records and notifications must be in place before work starts, and what should be kept after completion?

Read the worked answer

Before start, obtain a current Oklahoma DEQ notification with project dates, scope, contractor, and landfill; copies of the contractor license and worker certificates; bulk sample results and project design; respiratory protection and medical clearance records; waste manifest and landfill approval; containment and air monitoring plan; and occupant notification. After completion, keep the notification, waste shipment records, air monitoring, clearance, and training records. The owner should also verify the landfill accepts asbestos and that the transporter is permitted. A pre-construction conference with the owner, contractor, and monitor is advisable.