Ontario Class A Commercial study materials
Ontario Class A Commercial study resources

Steel Pipe on a Flatbed: The Arithmetic and the Edges

Ontario Class A Commercial · Put your knowledge to work in context.

All case studies

Steel Pipe on a Flatbed: The Arithmetic and the Edges

It is 07:20 on a wet October morning in a Sault Ste. Marie yard. You are loading 24,000 kg (52,900 lb) of 12 m (40 ft) steel pipe onto a 48 ft flatbed with a steel deck, 12 stake pockets and no headboard. The pipe is loaded in one tier and the last bundle overhangs the rear of the deck by 1.5 m. You plan to tie down with six 5/16 in grade 70 chains with snap-over binders; each chain assembly is tagged at a working load limit of 4,700 lb (2,130 kg). The chains pass directly over the sharp corners of the pipe. The tractor is permitted at 5,500 kg on the steering axle and 17,000 kg on the drive tandem, and the trailer tandem is permitted at 18,000 kg; the shipper's scale shows 24,000 kg of pipe over a tare of 13,500 kg. The run is 320 km on Highway 17.

1. How many tiedowns does NSC Standard 10 require, and is six chains enough?

Read the worked answer

Two rules must both be satisfied, and the higher number governs.

Rule 1 - aggregate working load limit. For general cargo the tiedowns must have an aggregate WLL of at least 50% of the weight of the article.

  • 24,000 kg = 52,910 lb; 50% = 26,455 lb.
  • 26,455 / 4,700 = 5.63, so 6 chains (28,200 lb aggregate).

Rule 2 - tiedowns by length. Two tiedowns for the first 3.04 m, plus one for each additional 3.04 m or part of it: 12 m gives 2 + 3 = 5 tiedowns.

Six satisfies both on paper, with only about 1,750 lb of margin - and only if every assembly really is rated 4,700 lb. A tiedown's WLL is that of its weakest component, so check the binders and the end fittings, and check what the chains are anchored to: a stake pocket is not a rated D-ring.

The arithmetic is not the real problem. Those chains run straight over sharp pipe edges, which is exactly what the edge-protection requirement exists for. A chain nicked or bent over a corner loses capacity and can be cut through in a hard stop, at which point the 4,700 lb tag is a number, not a property of your load.

2. What must change before you leave the yard?

Read the worked answer
  • Edge protection. Corner protectors, softeners or heavy dunnage at every point where a chain crosses an edge. Without it the aggregate WLL calculation is void.
  • The rear overhang. 1.5 m beyond the deck has to be controlled by the last tiedown, not left to bounce. A projection of 1 m or more beyond the rear needs a red flag in daylight and a red light at night, and it must not hide the tail lights, the plate or the conspicuity markings.
  • Binders. Fully over-centre, not loose, and secured with a retaining clip or wire so they cannot trip open.
  • Chain condition. No kinks, twists, cracks, stretched links or missing tags. A twisted chain loses a large part of its capacity.
  • Friction. Wet steel on a steel deck slides. Dunnage or friction mats under the bundles, and the pipe blocked against forward movement.
  • The re-check. Stop and re-tighten within the first 80 km, then every 3 hours or 240 km, and after any hard braking. Loads settle; the first 80 km is where chains go slack.

3. The pipe weighs 24,000 kg over a 13,500 kg tare. What do you check at the scale, and why does distribution matter as much as gross weight?

Read the worked answer

Gross is 37,500 kg against permitted axle limits of 5,500 + 17,000 + 18,000 = 40,500 kg, so the total looks fine. The axles are where it goes wrong.

  • Load too far forward. The drives take the weight and the trailer tandem goes light. A light trailer tandem brakes poorly and can unload the drives under braking, and an overloaded drive tandem is a chargeable offence even though the gross is legal.
  • Load too far back. The trailer tandem overloads and the steering axle goes light. A light steer axle is a handling defect: reduced steering authority and unbalanced braking, which is exactly what you do not want on Highway 17 in the rain.

So: scale each axle group separately, then move the load, slide the trailer tandems, or reposition the fifth wheel, and re-weigh. Do not leave the yard on the shipper's word.

Also check the deck rating and the load per metre. Twenty-four tonnes of pipe in 12 m is dense, and a flatbed's concentrated-load limit can be exceeded even when every axle is legal.