Roof-Mounted PV to Offset an Irrigation Pump
A 40-acre center pivot is rated 800 gpm at 60 psi at the pump discharge; pump efficiency is 70% and the motor and drive train 92%. The season is 1,400 pump hours. The producer wants a roof-mounted PV array on a 60-ft by 120-ft clear-span pole barn to "zero out" the pump bill. The ridge runs east-west and the 4/12 slope gives about 7,200 ft² of south-facing plane. The trusses were designed in 1998 for 30 psf ground snow and the drawings are marked "no reserve capacity." The utility credits exports at retail up to 110% of annual consumption and 3.5 ¢/kWh beyond that.
1. Determine the pump's electrical demand and seasonal energy use.
Read the worked answer
Hydraulic power.
hp_hyd = (gpm × psi) ÷ 1,714 = (800 × 60) ÷ 1,714 = 28.0 hp
Shaft power. 28.0 ÷ 0.70 = 40.0 hp at the pump shaft.
Electrical input. 40.0 ÷ 0.92 = 43.5 hp = 43.5 × 0.746 = 32.4 kW.
Seasonal energy. 32.4 kW × 1,400 h = ≈45,400 kWh.
Two things worth flagging now, before any array is sized:
- The pump draws 32 kW whenever it runs, but it only runs 1,400 h out of a ~120-day season - about 11.7 h/day average. The load is not a flat annual block; it is a summer-only, partly daytime load.
- A 32-kW motor also carries a utility demand charge that a PV array does not erase; the array reduces kWh and, only at the margin and only if the sun is out, coincident demand.
2. Size an array to offset the seasonal energy and evaluate whether "zeroing out" the bill is the right objective.
Read the worked answer
First-pass sizing. At roughly 5.2 peak-sun hours/day, a performance ratio of 0.80 and a 120-day season, a 1-kW array yields about 5.2 × 0.80 × 120 ≈ 500 kWh/season. To match 45,400 kWh:
45,400 ÷ 500 = ≈91 kW
Area check: at ~20% module efficiency that is roughly 455 m² ≈ 4,900 ft² of module area, which does fit inside the 7,200-ft² south plane.
But the objective is wrong. The match is on annual energy, not on the load's shape:
- At noon the 91-kW array produces about 73 kW while the pump draws 32 kW - most of the output is exported.
- In the evening and at night the pump imports at retail, and pumping is often scheduled at night to reduce wind drift and evaporation loss.
- The exports are credited at retail only because net metering happens to allow it, capped at 110% of annual use. That is a policy exposure, not a physical property of the system. Anything beyond the cap earns 3.5 ¢/kWh.
Better design. Size to the daytime load - roughly 60–75 kW - and shift irrigation toward daylight hours so the array serves the pump directly. The last increment of array capacity is displacing 3.5 ¢ exports in a few years and adds cost for no return. Also verify the interconnect: 91 kW on a rural service may require a study and transformer change, which can dwarf the array cost.
Recommendation to the owner: present the 60–75 kW option with daylight pumping as the base case, and show the 91-kW case only with net metering assumed to persist.
3. What must be resolved structurally before any module goes on that roof?
Read the worked answer
Dead load. Modules plus racking plus ballast or attachments run about 3.5–4 psf over 7,200 ft²: 25,000–29,000 lb added to a roof explicitly documented as having no reserve. Per truss at 8-ft spacing, tributary 8 × 60.5 = 484 ft² × 4 psf ≈ 1,940 lb of new dead load on each truss - small-sounding per square foot, not small summed over the span.
Effects beyond simple dead load:
- Snow behavior changes. Modules shed snow to the eave and create a drift at the lower edge; the array also blocks the uniform redistribution the original design assumed. The controlling load case may be a drift the truss was never checked for.
- Wind uplift on modules is concentrated at corners and edges and is transferred into purlins and trusses as point loads, not uniform load.
- Deflection and ponding - a more flexible roof under added load can pond, which is progressive.
What I would require before signing anything:
- A sealed structural evaluation by a licensed structural engineer of the actual as-built truss and purlin configuration with the array dead load, drift and uplift applied.
- If the roof cannot take it, a ground mount - which also gives a better tilt, no penetrations, no leak risk, and easier service. On an ag site with land available this is usually the right answer.
- No penetrations justified by "it's only 4 psf," and no reliance on a verbal assurance from a truss supplier.
The energy analysis is the easy half. The roof is where this project fails if it is not checked first.