A yard is building a 50,000 t deadweight MR product carrier: L 183 m, B 32.2 m, D 17.8 m, scantling draught 12.2 m, TPC about 51 t/cm at the scantling draught. At the detail-design gate the steel weight has come out 420 t above the estimate used to fix the contract deadweight of 49,900 t; the lightweight is now 12,520 t, leaving 49,480 t, and the owner refuses any deadweight below 49,900 t because the charter is written on it. The owner has also just added a 180 t scrubber on deck at 30 m above the keel and a 35 t ballast water treatment unit at 3 m above the keel. Options on the table: (a) ask the owner to accept 49,480 t; (b) reduce the double bottom height from 2.20 m to 2.10 m; (c) substitute higher-strength steel in the deck and inner bottom; (d) increase D by 150 mm and the scantling draught with it.

1. Quantify the gap and explain why trimming ballast capacity does not close it.

Read the worked answer

Deadweight at the scantling draught is fixed by geometry: DWT = displacement at 12.2 m - lightweight. The 420 t steel growth goes straight out of deadweight, so DWT is now 49,480 t - a shortfall of 420 t, or 0.84%.

Removing ballast tank capacity does not help, and this is the trap. Ballast is a deadweight item - it is carried in the deadweight, but the contract deadweight is the capacity at the scantling draught, which is a displacement fixed by the hull form and the allowed draught. Cutting a ballast tank does not increase the displacement available at 12.2 m; it only reduces what the ship can carry in a ballast passage. The only levers are: reduce lightweight, increase displacement (fuller form or more draught), or renegotiate the number.

Note the contractual context: 0.84% is inside a typical +/-1% deadweight tolerance in a newbuilding contract, so option (a) may be a commercial negotiation rather than a technical failure - but the owner's charter exposure has to be addressed explicitly, not buried in a tolerance clause.

2. Evaluate the yard's options (b), (c) and (d) technically.

Read the worked answer

(b) Double bottom 2.20 m to 2.10 m. Over roughly 120 m of cargo tank length and 26 m of breadth, a 0.1 m reduction applied to floors, girders and the inner-bottom structure saves of the order of 20-30 t - an order of magnitude short of 420 t. It also has to clear the CSR minimum double-bottom height, which for B = 32.2 m works out around B/20 = 1.6 m with the rule's absolute floor, so 2.10 m still complies; but raising the tank top cuts cargo cubic capacity, which matters if the ship trades low-density products. Worth having, but it does not solve the problem.

(c) Higher-strength steel in the deck and inner bottom. This is the only option with real weight leverage in the midship region - 100-200 t is plausible if the deck and inner bottom move to AH36 within the CSR thickness rules. Two caveats: thinner plate raises working stress, so buckling and the CSR fatigue assessment must be re-run and may govern; and it must be done as a proper optimisation, not by applying higher-strength steel globally, which saves less and costs more.

(d) Increase D by 150 mm and the scantling draught with it. At fixed draught, raising D adds shell and structure weight and gains nothing - deadweight falls. If the draught is also raised 150 mm, displacement gains about 51 t/cm x 15 cm = 765 t, but the added side shell, increased depth-dependent scantlings and the extra freeboard structure consume most or all of it; the net is small and possibly negative. It also changes the load line and may breach the discharge ports' draught limits.

3. Give your recommendation, and note the EEDI and stability consequences.

Read the worked answer

Recommendation: run (c) as a focused structural optimisation in the midship block with the fatigue and buckling checks redone, bank (b) as a smaller secondary saving only if cargo cubic capacity allows, reject (d) unless the ports will accept more draught, and take whatever residual remains to the owner as a documented deadweight shortfall within the contract tolerance - with the tolerance clause as the negotiating instrument, not as a way of hiding it.

EEDI: EEDI is proportional to installed power and inversely proportional to deadweight and speed. Every tonne of lightweight carried reduces both the denominator (deadweight) and, through added resistance, pushes required power up - so a weight growth of this kind is a double hit on the attained EEDI and must be re-run, not assumed unchanged. Option (c) genuinely improves EEDI by recovering deadweight.

Stability: the scrubber is the hidden problem. 180 t at 30 m on a lightweight of about 12,700 t moves KG by roughly 180 x 30 / 12,700 = 0.42 m before any other change - a large shift for a tanker with modest GM margins. Re-run the intact-stability condition at the scantling draught and the ballast condition before the deck layout is frozen; if GM is marginal, relocate or ballast-compensate the unit rather than adding permanent ballast, which would give the deadweight back with interest.